Caltrans Changes SECTION 39 “Hot Mix Asphalt”

Caltrans Changes SECTION 39 “Hot Mix Asphalt”. Presented by: Terrie Bressette Caltrans. What Changed? TERMS. Hot Mix Asphalt (HMA) = Asphalt Concrete (AC) Rubberized HMA (RHMA) = Rubberized AC (RAC) Open Graded Friction Course (OGFC) = OGAC RHMA-G = RAC (Type G)

Jimmy
Download Presentation

Caltrans Changes SECTION 39 “Hot Mix Asphalt”

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Caltrans ChangesSECTION 39“Hot Mix Asphalt” Presented by: Terrie Bressette Caltrans

  2. What Changed? TERMS • Hot Mix Asphalt (HMA) = Asphalt Concrete (AC) • Rubberized HMA (RHMA) = Rubberized AC (RAC) • Open Graded Friction Course (OGFC) = OGAC • RHMA-G = RAC (Type G) • RHMA-O & -O-HB = RAC (Type O) & (Type O-HB) • Tack Coat = Paint Binder (Tack Coat) • Geosynthetic Pavement Interlayer = • Pavement Reinforcing Fabric (PRF)

  3. What Changed?Section 39 – AC vs. HMA • Old Standard Specifications • Section 39 – AC = 12,000 Words • New “Amended to Read” • Section 39 – HMA = 18,000 Words • SSPs • Section 39 AC = 21 SSPs 58,000 Words • Section 39 HMA = 12 SSPs 28,500 Words

  4. What Changed?Standard Special Provisions • 12 SSPs from 30+ Old SSPs • 39-AAA – HMA Type A & B • 39-BBB – OGFC • 39-CCC – RHMA-G • 39-DDD – RHMA-O & RHMA-O-HB • 39-EEE – HMA (Misc. Areas) • 39-FFF – Minor HMA • 39-GGG – Rumble Strips (Ground in) • 39-HHH – HMA-Lime Slurry • 39-III – HMA-Dry Lime • 39-JJJ – HMA-Liquid Anti-Strip • 39-KKK – Prime Coat • 39-LLL – Replace AC Surface

  5. What Changed?Standard Special Provisions • New SSPs • 39-MMM – Large Stone Mix • 39-NNN – High Stability Mix • 39-OOO – Bonded Wearing Course (Gap-Graded) • 39-PPP – Bonded Wearing Course (Rubberized) • District Requested • Extra testing required by aggregate issues • Lime-slurry marination required

  6. Section 39 – CHANGESMix Designs • Still Hveem Method of Mix Design • Dense Graded – HMA (Type A & B) Rubberized HMA – RHMA-G • Mix Design by Producer • State Verifies JMF with Plant Mix • Mix design good for 12-months • Flat & Elongated • Open Graded – OGAC, RHMA-O & O-HB • Aggregate qualities and gradation by Producer • State determines asphalt content • Mix design good for 12-months

  7. Section 39 – CHANGESMaterials • Aggregate Qualities • Gradation(TV ± Tolerance) • LA Rattler • Sand equivalent • % Crushed Particles(2-face – New) • Fine Aggregate Angularity(New) • Flat & Elongated(New)

  8. Section 39 – CHANGESMaterials • Mix Qualities • Binder Content • Air voids content • Stability (Mix & Production) • HMA moisture content • Voids in Mineral Aggregate (Mix Design & Verification) • Voids Filled with Asphalt (Mix Design Only) • Dust Proportion (Mix Design Only)

  9. Section 39 – CHANGESMaterials • CT371 Pilot • California Test (CT) 371  AASHTO T283-03 • In QC/QA projects for 2 years • Estimate approx 25 projects / year • Producer tests mix with CT371 • Chooses treatment choice (TSR  70) • Test HMA at least once during production • District & Translab tests also (FIO) • Data analysis – repeatability, lab / lab, mix vs. production

  10. Section 39 – CHANGESConstruction • Processes – • Standard • HMA (Type A & B) • RHMA-G • OGAC & RHMA-O • Method • Small quantities • QC/QA - >10,000 tons • HMA (Type A & B) • RHMA-G

  11. Section 39 – CHANGES(3 Construction Processes) • Standard – • Applies to the majority of HMA. • Contractor QC plan & tests at least twice daily • Compaction (91 – 97% of Rice) • State will test and results will be used for acceptance and pay

  12. Section 39 – CHANGES(3 Construction Processes) • Method – • Applies to very small quantities of HMA • The contractor will not perform QC • Method compaction with roller and temperature requirements • State will test and results will be used for acceptance and pay. • Default for compaction when layer <0.15-ft

  13. Section 39 – CHANGES(3 Construction Processes) • QC/QA – • All HMA quantities greater than 10,000 tons. • QC tests for each 750 tons of HMA • State will verify gradation & % binder • 1 verification per 5 QC tests • Statistical evaluation of gradation, % binder and compaction for pay. • Verified contractor QC for gradation & % binder • Sate cores for compaction (92 – 96% of Rice)

  14. Section 39 – CHANGESProduction • Materials Production Quality Program – • HMA & PCC (soon) • Weights and Measures • Safety • Limited production unit requirements

  15. Section 39 – CHANGESPlacement • Lift Thickness > 3 X NMAS e.g. ¾-inch mix = 0.20-ft layer and above ½-inch mix = 0.125-ft layer • Must comply for compaction • Contractor may change gradation of mix if ¾” mix and 0.15 to 0.20 layer • Not required for Method • Thin blanket – Maintenance • Leveling, etc.

  16. Section 39 – CHANGES • HMA must meet all specification requirements throughout production and placement. • First out of spec = Contractor Fix • Second out of spec = Stop, test, show RE before starting up • In-place & out-of-spec material • RE determines status on case-by-case

  17. Thank you Any Questions?