1 / 24

Developing Tools for Project Managers to Make Environmental Considerations in the Systems Acquisition Process

Developing Tools for Project Managers to Make Environmental Considerations in the Systems Acquisition Process. Joakim Tornéus Swedish Defence Materiel Administration (FMV) Stockholm, Sweden. Independent . FMV . is an independent, civilian authority reporting directly to the Government

Jims
Download Presentation

Developing Tools for Project Managers to Make Environmental Considerations in the Systems Acquisition Process

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Developing Tools for Project Managers to Make Environmental Considerations in the Systems Acquisition Process Joakim Tornéus Swedish Defence Materiel Administration (FMV) Stockholm, Sweden

  2. Independent FMV • is an independent, civilian authority reporting directly to the Government • primarily works for the Swedish Armed Forces, its most important customer • also undertakes assignments on behalf of other authorities • is assigned by the Government to handle export support

  3. Business concept "FMV is to contribute through cost-effective, business-like and reliable supply of materiel to strengthening the operational capability of the Swedish Armed Forces."

  4. Technology for Sweden's Security FMV • controls the design and procurement of new materiel • develops materiel and systems for the defence of the future • takes technical responsibility for the materiel throughout its lifetime • creates scope for renewal by phasing out obsolete materiel FMV has a variety of assignments P H A S E - O U T R E Q U I R E M E N T S V A L I D A T I O N PROCUREMENT N E E D S M A I N T E N A N C E The Armed Forces FMV Supplier

  5. Tools for greening the acquisition • FMV’s Environmental Guidelines in the Acquisition Process • The Swedish Defence’ Criteria For Chemical Substances • Chemical Products database

  6. FMV’s Environmental Guidelines in the Acquisition Process Why? • Driving forces • Environmental impact • EMS • Environmental impact • Environmental policy • Environmental objectives

  7. Driving Forces Customers demands The Owner´s demands Legal demands Goodwill

  8. Environmental Impact FMV have identified the systems acquisition process as the activity with the greatest environmental impact

  9. FMV Environmental Management System Integrated Management System based on: • ISO 14001 • ISO 9001:2000 • ISO 15288 • OHS • Rules of Military Aviation

  10. Environmental Policy “FMV participates in long-term sustainable development of society by considering the environmental aspects of materiel systems from a life-cycle perspective”

  11. Environmental Objectives FMV shall have a quality assured, environmental sound and process oriented workflow. Indicators: • A minimum of 50% of all acquisitions shall contain environmental requirements • A minimum of 50% materiel systems lifecycle management plans shall have approved environmental plans • Approved environmental plans in the materiel tests shall increase during 2004

  12. FMV’s Environmental Guidelines in the Acquisition Process What we knew: • Project managers have basic environmental knowledge • Variable quality of our environmental requirements • Environmental requirements not always on level with the systems environmental impact

  13. FMV’s Environmental Guidelines in the Acquisition Process What we wanted: • Cover all phases in the acquisition process • Increase the quality of environmental requirements • An integrated part of the management system • Easy to access and to use • Information on legal demands and other applicable demands • Examples of texts to use in request for proposals and contracts

  14. FMV’s Environmental Guidelines in the Acquisition Process Result so far: • The tool easily accessible on the Intranet • Three phases covered: • Studies (generating and evaluating concepts) • Acquisition • Phasing out and disposal • Information on legislation and other demands • Continuously updated and improved

  15. Basic structure Environmental Guidelines in the acquisition process Phase in the acquisition process/product life cycle Studies Acquisition Phase-out Information on basic requirements, responsibilities, demands from stakeholders, legislation, customer, owner etc… Contractor Product EMS Electronics Detailed requirements on contractor or product Environmental plan Hazardous Materials etc… etc…

  16. Basic structure Environmental Guidelines in the acquisition process Phase in the acquisition process/product life cycle Studies Acquisition Phase-out Information on basic requirements, responsibilities, demands from stakeholders, legislation, customer, owner etc… Sales Scrapping Legal requirements Requirements on contractor Detailed requirements on contractor or product Legal requirements

  17. Environmental Requirements Requirements on the contractor (Statement of Work) • Environmental management system • Environmental plan • EMS auditing

  18. Environmental Requirements Requirements on the product (Specification of Technical Requirements) • Hazardous materials • Batteries • Electronics • Construction materials • Chemicals • Energy consumption • Emissions • Design for demil

  19. FMV’s Environmental Guidelines in the Acquisition Process Still to be done: • Develop the tool for the Operational and Maintenance phases • More concrete examples of texts to use • Proceed with the integration with the Management System

  20. The Criteria For Chemical Substances • General FMV policy • Three parts: • Evaluation criteria according to classification • Substances prohibited by law • Undesirable substances • Sorted according to application • Hazardous substances in materials • Substances that will be banned/restricted in the future

  21. The Criteria For Chemical Substances The general policy: As far as possible all materiel supplied to FMV shall be free from substances that are very toxic, carcinogenic, allergenic, environmentally hazardous, affect genetic material, reproduction, the climate and the ozone layer

  22. Chemical Products Database • Chemical management tool • Consists of Material Safety Data Sheets (MSDS) for chemical products used in the Swedish Armed Forces • Approximately 1700 MSDS • Benefits: • Overview over chemicals used • Tool for substitution • Statistics

  23. Summary • The Environmental Guidelines in the Acquisition Process • Important tool in greening our acquisition process • Will make it easier to fulfil our environmental objectives • Continuously improved in cooperation with the project managers

  24. Questions? joakim.thorneus@fmv.se +46 8 782 43 03 jari.hiltula@fmv.se +46 8 782 65 34