Presentation on Services Provided By RP&P Management Limited

Presentation on Services Provided By RP&P Management Limited. RP&P Management Limited. 1. Services. CDM Co-ordinator H&S Consultancy H&S Training Party Wall Surveying Building Surveying Project Management Residential Surveying/HIP. RP&P Management Limited. 2. CDM Co-ordinator.

Leo
Download Presentation

Presentation on Services Provided By RP&P Management Limited

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Presentation onServices ProvidedByRP&P Management Limited RP&P Management Limited 1

  2. Services • CDM Co-ordinator • H&S Consultancy • H&S Training • Party Wall Surveying • Building Surveying • Project Management • Residential Surveying/HIP RP&P Management Limited 2

  3. CDM Co-ordinator RP&P Management Limited 3

  4. CDM Co-ordinator The Duties • Statutory Basis - Construction (Design & Management) Regulations 2007 - Now includes CHSW regs. and Management regs. - Managing Health and Safety in Construction (ACOP) - ALL are Secondary to Health & Safety at Work Act 1974 • CDM Regulations 2007 imposes responsibilities on - Client - Designers - CDM Co-ordinator - Principal Contractors - Contractors RP&P Management Limited 4

  5. CDM Co-ordinator Application of Duties • ALL the duty holders responsibilities apply if a contract for work - Lasts longer than 28 days • - There are more than 17 men on site • For smaller works CDM still applies but a CDMc does not need to be appointed and it is not notifiable to HSE - Client, Designer, Principal Contractor and Contractor responsibilities • Requirement to appoint a CDM Co-ordinator for Demolition • What is a Designer? - Includes anyone who specifies RP&P Management Limited 5

  6. CDM Co-ordinator Health & Safety Files Changes • Electronic Health & Safety Files - Health & Safety Files to be made available on RPPML Portal - Changes to H & S Files can be carried out by Client’s on line - Portal can be used for Client’s “Asbestos Register” Main Changes to the Regulations (ACOP) -Requirement to appoint a Co-ordinator no later that detail design (stage D) -The Coordinator will manage the flow of Health and Safety information between Client, Designer and Principal Contractor -The Client will appoint the Co-ordinator who will assist the Client with their duties -The Co-ordinator will have a greater involvement in design and construction RP&P Management Limited 6

  7. H&S Consultancy RP&P Management Limited 7

  8. H&S Consultancy • We provide a wide range of H&S Consultancy in General H&S and Construction related H&S matters • Statutory Basis • Increases and changes in Regulations and Legislation RP&P Management Limited 8

  9. H&S Training RP&P Management Limited 9

  10. H&S Training Training Courses Offered CURRENT COURSES DELIVERED CITB • 5 day Site Manager. • 2 day Site Manager refresher course. • 3 day Site Supervisor. • 1 day Site Supervisor refresher. • 1 day H&S Awareness. BESPOKE COURSES • Asbestos Awareness • Senior Management – ½ day. • Managers – ½ day. • Operatives – 1 day. • Surveyors – 1 day (2 days with practical). • Risk Assessment • General. • Designers. • Competence Management. • H&S for Directors. RP&P Management Limited 10

  11. H&S Training Training Courses Offered CIEH • Foundation Certificate in Health & Safety in the Workplace: Level1. • Supervising Health & Safety in the Workplace: Level 2. • Advanced Health & Safety in the Workplace: Level 3. • Professional Trainer Cert: Level 3. CITB • 5 day Site Manager. • 2 day Site Manager Refresher. • 3 day Site Supervisor. • 1 day Site Supervisor Refresher. • 1 day H&S Awareness. IOSH • Working Safely: Level 1. • Managing Safely: Level 3. • Directing Safely: Level 3. NEBOSH • General Certificate: Level 4. • Construction Certificate: Level 4. • Fire Safety & Risk Management: Level 4. RP&P Management Limited 11

  12. H&S Training Training Courses Offered BESPOKE COURSES • Asbestos Awareness • Senior Management – ½ day • Managers – ½ day • Operatives – 1 day • Surveyors – 1 day (2 days with practical) • Designers • Confined Spaces: ½ day Awareness. • Display Screen Equipment Assessors Training: ½ day. • Essentials of Fire Risk Assessment: ½ day. • Fire Safety Awareness. • Fire Safety for Fire Marshall’s/Fire Wardens. • Manual Handling: ½ day. • Accident Reporting & Investigation: ½ day. • Noise in the Workplace; ½ day. • Risk Assessments Principles and Practice: 1 day. • Risk Assessment for Designers. • CDM Regs 2007 updates: 1 day. • COSHH Awareness: ½ day. • Managing Working At Heights: ½ day. • Selection & Management Of Contractors: ½ day. • Competence Management. • H&S for Directors. RP&P Management Limited 12

  13. Party Wall Surveying RP&P Management Limited 13

  14. Party Wall Surveying Statutory Basis • The Party Wall etc Act 1996 The Act governs the way in which a building owner can carry out work to a party wall, party structure or party fence wall • What is a party wall? - A wall is a party wall if it stands astride the boundary of land belonging to two or more different owners - A wall is a party fence wall if it is not part of a building, and stands astride the boundary line between lands of different owners - A party structure could be a wall, floor, partition or other structure separating buildings or part of buildings RP&P Management Limited 14

  15. Party Wall Surveying The Role and Authority of Surveys • Notification to ALL adjoining owners of the proposed work - Maximum of 2 months notice is required depending on the type of notice - Notices must include drawings which indicate precise details of the proposals • Obtaining adequate information from the Design Team - Must be able to show exact proposals to adjoining owner and/or surveyor • Agreeing the Award - Of critical importance is the Schedule of Conditions, even if no award - The award is a legally binding document stating how and what will be done - Case law has emphasised the importance of complying with the Act • Completing the works - Final check after work completed to ensure no damage to adjoining owner RP&P Management Limited 15

  16. Building Surveying RP&P Management Limited 16

  17. Building Surveying Type of Surveys • Commercial Building Surveys - Full or part inspections and reports to identify defects and diagnose cause - Measured land and building surveys for production in AutoCAD format - Dilapidations surveys during or at the end of a lease (CPR) - Condition surveys for property assessments and future budgeting • Pre-Acquisition Surveys - Full inspection and reports on condition of Freehold and Leasehold property - Estimate of likely scale of repairs/improvements in short to long term • Defects Analysis - Investigation into latent defects on building projects - Investigation and reporting on failure of a particular building element RP&P Management Limited 17

  18. Building Surveying Types of Surveys (cont) • Compliance Checking - Inspection and reporting on quality and progress of construction projects - Includes comments on design, materials and workmanship - Signing off Professional Consultants Certificate (NHBC) • Snagging - Checking completed construction projects for defective design, materials and workmanship - Back checking of snagging works to improve client satisfaction • Access Audits - Inspection of buildings in connection with needs of disabled people (DDA) - Reporting and provision of programme to address physical barriers RP&P Management Limited 18

  19. Project Management RP&P Management Limited 19

  20. Project Management • Scope of the Service • Clarity in defining the project • - Detailed appreciation of each Clients needs and expectations - Unique combination of skills, knowledge and commercial insight - Specialist support to in house teams • Identification of objectives • - Understanding objectives in terms of time, cost and quality • - Specified in terms of target dates, budgets and standards • - Understanding Client’s priority for each objective • - Advice on contract and procurement routes • Defining roles • - Assemble the team to deliver the project • - Briefing team on Client’s objective • - Brief individuals on their precise role in the project RP&P Management Limited 20

  21. Project Management Scope of the Service (cont) • Establishment of detailed controls - Definition of coordination and reporting routines • Management of remaining time, cost and performance - Establishment and maintenance of project programme - Establishment of cost and quality plans - Monitor progress, evaluate status and manage delivery • Active Management - Experience in leading and directing teams - Personal, presentational and communication skills RP&P Management Limited 21

  22. Residential Surveying/HIP RP&P Management Limited 22

  23. Residential Surveying • Preparation of Measured Drawings & Plans • Planning and Building Regulation Applications • Boundary Disputes • Expert Witness Reports • Building Surveys • Home Information Packs RP&P Management Limited 23

  24. Residential Surveying Preparation of Measured Drawings and Plans • Measured Building Surveys - Provision of scale plans, sections and elevations for design proposals - Preparation of existing drawings for Planning Applications - Calculation of net internal floor areas - Provided in hand drawn or Auto CAD format • Measured Land Surveys - Level surveys for existing buildings, drainage and building plots - Boundary surveys for building plots and boundary disputes - Tree surveys in connection with Planning Applications - Provided in hand drawn or Auto CAD format RP&P Management Limited 24

  25. Residential Surveying Planning and Building Regulations Applications • Planning Applications - Initial appraisal of client’s requirements - Extensions, conservatories, listed buildings, conservation areas etc - Preparation of existing plans, sections and elevations for outline proposals - Liaison with Local Planning Authority - Completion of outline and detailed proposals for client approval - Submission of Full Planning Application forms • Building Regulations Applications - Preparation of production information sufficient for statutory approval - Loft conversions, extensions and internal alterations - Foundations, walls, windows, floors, roofs and ventilation etc - Application for Building Control Approval (LA or Approved Inspector) RP&P Management Limited 25

  26. Residential Surveying Boundary Disputes • Neighbours at war - Exact boundary lines between properties are difficult to define - Original boundaries can be altered - Non defined boundaries may have been assumed • Defining a boundary - Neighbour may have acquired land through adverse possession - Obtain title deed plan and register (if registered) - Original title deeds (written description over plan) - Accuracy of 1:1250 title deed plan plus or minus 1.0 m (2.3m for 1:2500) - Aerial photographs - Documents from recent property transfer - Existing features on the ground may help together with nearby properties RP&P Management Limited 26

  27. Residential Surveying Expert Witness • Role of the Surveyor - Asked to provide advice on poor workmanship and materials - Kitchens, joinery, brickwork, plumbing, boundaries etc - Minimum of 5 years of experience in the particular field - Written report to be prepared in model format • Duty to the Courts - Governed by part 35 of the Civil Procedure Rules (CPR) - Independent and impartial advice overriding obligation to appointing party - Without prejudice meetings set out what has and has not been agreed - May be required to give evidence in court RP&P Management Limited 27

  28. Residential Surveying Building Surveys • Full Building Survey (Formally structural Survey) - Careful and thorough inspection of the property - Records and provide a detailed report on the construction and condition - Reports and diagnoses the cause of any defects which have been identified - Provides a summary of repairs and costs where required • Homebuyers Survey and Valuation – NOT UNDERTAKEN BY RPPML - General surface inspection of property - Reports on urgent and significant matters only. Includes a valuation - These reports identify significant matters which require further investigation • Partial Inspection - Careful and through inspection of a particular building element - Inspection and report will diagnose cause of defect (HSVR) RP&P Management Limited 28

  29. Residential Surveying Case Studies - 1 RP&P Management Limited 29

  30. Case Studies - 2 Residential Surveying RP&P Management Limited 30

  31. Residential Surveying Case Studies - 3 RP&P Management Limited 31

  32. Residential Surveying Case Studies - 4 RP&P Management Limited 32

  33. Residential Surveying Home Information Pack • Housing Act 2004 - Introduction of certain changes to Housing • Legal Duty to Provide Home Information Pack (HIP) - To be assembled by anyone responsible for marketing a property - Mandatory from January 2008 - 3 Bedroom Properties £300.00 including VAT - 4 Bedroom Properties £325.00 including VAT RP&P Management Limited 33

  34. Any Questions? RP&P Management Limited 34