1 / 11

NTC 406 Experience Tradition- tutorialrank.com

For more course tutorials visit<br>www.tutorialrank.com<br><br>NTC 406 Week 2 Team: Generic Manufacturing Company Project, Part I WAN Assessment<br> <br>NTC 406 Week 2 Individual TCP/IP Network<br> <br>NTC 406 Week 3 Team: Generic Manufacturing Company Project, Part II Troubleshooting FAQ<br> <br>NTC 406 Week 3 Individual Internet Transport Services<br> <br>

Download Presentation

NTC 406 Experience Tradition- tutorialrank.com

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NTC 406 All Assignments For more course tutorials visit www.tutorialrank.com NTC 406 Week 2 Team: Generic Manufacturing Company Project, Part I WAN Assessment NTC 406 Week 2 Individual TCP/IP Network NTC 406 Week 3 Team: Generic Manufacturing Company Project, Part II Troubleshooting FAQ NTC 406 Week 3 Individual Internet Transport Services NTC 406 Week 4 Team: Generic Manufacturing Company Project, Part III Internet Security NTC 406 Week 4 Individual Network Security

  2. NTC 406 Week 5 Team: Generic Manufacturing Company Project, Part IV Internet Security NTC 406 Week 5 Individual Emerging Networking Technologies ============================================== NTC 406 Week 2 Individual TCP/IP Network For more course tutorials visit www.tutorialrank.com NTC 406 Week 2 Individual: TCP/IP Network Your manager has tasked you with creating a Remote Employee Connection guide for IT. This guide will assist IT in setting up remote (work-from-home) employees to access the company’s Intranet. These employees will use a VPN connection from their PC in home to a remote VPN server located in the employee’s work campus. Create a 2- to 3-page guide using Visio® including the following:  WAN access options from the home to an ISP

  3.  WAN access options from the work campus to another ISP (assuming a different ISP is used)  An end-to-end (from PC to VPN server) network diagram showing routers, switches, hosts and connections. Show on the diagram your choice of one of options considered; i.e., WAN access from home, or WAN access from work.  Major TCP/IP protocols with which the home PC is involved, from the moment it boots up until its first IPv4 packet reaches the VPN server.  Illustration of how the first IPv4 is forwarded through the network, showing:  Source and destination IPv4 addresses  Source and destination MAC addresses for the initial 2 hops in the header of the packet Entries in the routers’ forwarding tables  Major routing protocols involved in building the forwarding tables  Repeat the last two items in the case of IPv6 Note: It is recommended that Visio® be used to create network diagrams for the presentation. Copy and paste your network diagrams into Microsoft® Word. Submit your assignment using the Assignment Files tab. Do not submit Visio® files. ==============================================

  4. NTC 406 Week 2 Team: Generic Manufacturing Company Project, Part I WAN Assessment For more course tutorials visit www.tutorialrank.com NTC 406 Week 2 Team: Generic Manufacturing Company Project, Part I: WAN Assessment Refer to the Project Overview and the attached documents provided in Week One. Your team, working directly with the CIO of Generic Manufacturing Company, will conduct an in depth analysis of the Wide Area Network utilized by Generic Manufacturing Company and all of their plant locations. Your manager has requested you create a presentation which will be used to present to the executive committee and CIO who are not very technical. Using Service Request 01 in the documents you downloaded in Week One, provide a WAN Assessment for Generic Manufacturing Company. Create a 4- to 6-slide Microsoft® PowerPoint® WAN Assessment presentation including the following:  Outline of all the WAN components and their connectivity, including an inventory of all equipment and connectivity by location, as well as a survey of network applications running over the network  Videos, audio, photos, diagrams, or graphs as appropriate

  5.  Substantial speaker notes to elaborate on the key points of your plan, or insert audio narration into your presentation Submit your assignment using the Assignment Files tab. ============================================== NTC 406 Week 3 Individual Internet Transport Services For more course tutorials visit www.tutorialrank.com NTC 406 Week 3 Individual: Internet Transport Services You are a Network Engineer for an IT consulting company. Your current client is a software developer. Recently they created a software which is capable of file transfers, voice chat, and videoconferencing. Your manager has tasked you with creating an Internet Transport Services proposal plan for the client’s new software. Write a 1- to 2-page Internet Transport Services proposal using Microsoft® Word, include the following:  Identify at least four candidate transport protocols. Compare and contrast them in a table.

  6.  Propose which transport protocol(s) to be used for data, voice, and video transport respectively and the rationale.  Identify an existing similar software in the market place and research on the transport protocols used in that software.  Reasons for the difference(s) from your choice (where applicable). Submit your assignment using the Assignment Files tab. ============================================== NTC 406 Week 3 Team: Generic Manufacturing Company Project, Part II Troubleshooting FAQ For more course tutorials visit www.tutorialrank.com NTC 406 Week 3 Team: Generic Manufacturing Company Project, Part II: Troubleshooting FAQ Refer to the Project Overview and the attached documents provided in Week One. Identify and mitigate WAN network issues for Generic Manufacturing Company using Service Request 02 – Legacy Problems.

  7. Building on the WAN analysis you conducted in Week Two for Generic Manufacturing Company, your team will identify potential problems and propose possible solutions. Create a 1-page Troubleshooting FAQ document using Microsoft® Word that will be presented to the executive committee and CIO who are not very technical. Include the following:  Potential problems in terms of outdated technologies, Quality of Service (QoS), performance, and other areas identified in your assessment  Solutions proposed Submit your assignment using the Assignment Files tab. ============================================== NTC 406 Week 4 Individual Network Security For more course tutorials visit www.tutorialrank.com NTC 406 Week 4 Individual: Network Security You recently joined a small company of less than 50 employees to help design and build a network infrastructure. Your boss (who is the owner of the company) is aware of many reports of network security incidents

  8. in the media and would like to know how you plan to make the network secure. Being a network professional conversant with OSI layering model, you are inclined to think about each measure in such framework as well (e.g., is it layer 1, 2, 3, 4, or the upper layer?). Create a 1-page Action Plan table using Microsoft® Word outlining your plan to analyze the network with the determination of how to secure the network. Include your thought process in each step. Submit your Action Plan using the Assignment Files tab. ============================================== NTC 406 Week 4 Team: Generic Manufacturing Company Project, Part III Internet Security For more course tutorials visit www.tutorialrank.com NTC 406 Week 4 Team: Generic Manufacturing Company Project, Part III: Internet Security Refer to the Project Overview and the attached documents provided in Week One. Provide a network security assessment for Generic Manufacturing Company using Service Request 03 – Internet Security in the WAN.

  9. Your team, working directly with the CIO of Generic Manufacturing Company, will conduct an in-depth network security analysis. Create a 1- to 2-page Internet Security report using Microsoft® Word that will be presented to the executive committee and CIO who are not very technical. Include the following:  Internal and external penetration testing at all Generic Manufacturing Company locations  Recommendations as to how to improve the overall network security to address all of the weaknesses discovered during analysis Submit your assignment using the Assignment Files tab. ============================================== NTC 406 Week 5 Individual Emerging Networking Technologies For more course tutorials visit www.tutorialrank.com NTC 406 Week 5 Individual: Emerging Networking Technologies You are the network operation manager of an organization. The senior management team is aware of legacy applications running on the network infrastructure maintained by your team. To increase efficiency and reduce cost, you are considering a pilot move to a cloud-based

  10. platform. As a first step, you would like to brief the senior management team on the changing landscape in networking technologies, as well as opportunities and challenges brought about by the changes. Create an 8- to 10-slide professional Microsoft® PowerPoint® presentation including the following:  Compare and contrast software-defined networking  Analysis of network function virtualization and cloud computing  Examination of opportunities and challenges (e.g., security, cost, reliability, and availability)  Videos, audio, photos, diagrams, or graphs as appropriate  Substantial speaker notes to elaborate on the key points of your plan  Audio narration within your presentation Submit your PowerPoint® file using the Assignment Files tab. ============================================== NTC 406 Week 5 Team: Generic Manufacturing Company Project, Part IV Internet Security For more course tutorials visit www.tutorialrank.com

  11. NTC 406 Week 5 Team: Generic Manufacturing Company Project, Part IV: Internet Security Refer to the Project Overview and the attached documents provided in Week One. Integrate/adopt at least one emerging new technology into Generic Manufacturing Company network and make appropriate adjustment(s) to the WAN to accommodate such integration(s). Your team, working directly with the CIO of Generic Manufacturing Company, will conduct an in depth network security analysis. Create a 5- to 10-slide Microsoft® PowerPoint® presentation which will be presented to the executive committee and CIO who are not very technical. Include the following:  At least one emerging new technology into Generic Manufacturing Company’s network with appropriate adjustments to the WAN to accommodate such integrations  Incorporation of assignments from Week Two, Week Three, and Week Four with instructor feedback  Videos, audio, photos, diagrams, or graphs as appropriate  Substantial speaker notes to elaborate on the key points of your plan, or insert audio narration into your presentation Submit your assignment using the Assignment Files tab. ==============================================

More Related