290 likes | 679 Views
Traffic Control Person Training. Agenda. Course Introduction Complying with Regulations and Standards Using Traffic Control Equipment Setting Up Work Zones Basic Traffic Control Skills. Day 1. OH 1-1 . Agenda. Recap Working Around Construction Equipment
E N D
Agenda • Course Introduction • Complying with Regulations and Standards • Using Traffic Control Equipment • Setting Up Work Zones • Basic Traffic Control Skills Day 1 OH 1-1
Agenda • Recap • Working Around Construction Equipment • Building on Basic Traffic Control Skills • Course Review • Wrap Up Day 2 OH 1-2
Parts of a Work Zone Termination Area Work Area Buffer Space Transition Area Advance Warning Area OH 4-1
Planning a Work Zone Consider • Duration or type of job • Road configurations • Traffic variations • Environmental conditions • Work site variations • TCPs required OH 4-2
Setting Up a Work Zone Procedures • Review traffic plan or work zone layout • Check availability and condition of traffic control devices • Select traffic control devices • Place the devices starting with the advance warning area OH 4-3
Crawler Tractor OH 6-1
Grader OH 6-2
Articulated Dump Truck OH 6-3
Dump Truck OH 6-4
Roller OH 6-5
Wheeled Crane OH 6-6
Excavator OH 6-7
Loader OH 6-8
Skid Steer Loader OH 6-9
Paving Machine OH 6-10
Aerial Lift Vehicle OH 6-11
Auger Truck OH 6-12
Tow Truck OH 6-13
Line Painting Truck OH 6-14
Wood Chipper OH 6-15
Emergency Procedures • Transportation of Dangerous Goods • Hazardous Spills • Broken Gas Lines • Broken Sewer Lines • Broken Gas Mains • Downed or Broken Power Lines OH 7-1
Intermittent Moving Work OH 7-2