1 / 4

Preliminary Design Review 1: Project Plan

Renfred
Download Presentation

Preliminary Design Review 1: Project Plan

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Senior Design: Team Burja_______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ Preliminary Design Review 1: Project Plan AME 470: Senior Design ASME Bulk Material Transporter Matt Bertke, Paul DeMott, Patrick Hertzke, Will Sirokman 26 August 2004

  2. Senior Design: Team Burja_______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ Team Structure Team roles and responsibilities Team Leader Paul DeMott Chief Engineer Will Sirokman CAD/CAM and Fabrication EngineerPatrick Hertzke Electrical and Controls Engineer Matt Bertke

  3. Senior Design: Team Burja_______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ PRD Schedule Tentative Schedule of Preliminary Design Reviews 26-Aug Team Organization 21-Aug Design Requirements, Specifications and Constraints 7-SepIndividual Concepts 14-SepTeam Concept 21-SepMobility 28-SepGrain Transportation and Delivery 5-OctControls and Electronics 12-Oct CAD/CAM 26-OctList of all parts and their sources; estimate of production costs. 2-NovOutstanding Issues 9-NovNone Scheduled 16-NovNone Scheduled

  4. Senior Design: Team Burja_______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ Gannt Chart Graphical display of project scheduling

More Related