Layered Process Audits

Layered Process Audits. Tommy Beheler Quality Manager The Timken Company’s Gaffney Bearing Plant. Background. Mandated by DaimlerChrysler for all tier 1 suppliers Strongly recommended by General Motors and Ford The Timken Company has been utilizing Layered Process Audits since 2004 .

Rita
Download Presentation

Layered Process Audits

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Layered Process Audits Tommy Beheler Quality Manager The Timken Company’s Gaffney Bearing Plant

  2. Background • Mandated by DaimlerChrysler for all tier 1 suppliers • Strongly recommended by General Motors and Ford • The Timken Company has been utilizing Layered Process Audits since 2004

  3. LPA’s Like Preflight Checklist. Is Everything Ready for Take-off Definition • An ongoing system of process checks that verify proper methods, settings, tools, gages, operator craftsmanship, error proofing devices, and other important inputs are in place in order to achieve optimal results. • Redundant process checks to make sure everything is right. • Ensure multiple eyes looking at the process to ensure the key work steps are being performed properly.

  4. Requirements for LPA’s • LPA’s shall be conducted for high risk elements at a minimum of once per shift. • Checklist of high risk items can be established using reference items such as, customer complaints, warranty issues, PFMEA, etc. • Audit items should be unambiguous and specific. • LPA results should be recorded and posted and reaction plans for non-conformances found during audit shall be documented.

  5. Requirements for LPA’s • Non-conformances should be corrected immediately. • Audit results shall be summarized and reviewed by plant leadership (non-conformance database) • Successive levels of plant leadership shall perform the exact same audit as the first level auditors and insure that first level audits are being done.

  6. Requirements for LPA’s • LPA items can be added and taken away. An audit item should not be deleted, unless the risk is eliminated and verified. • LPA items should be limited to those items critical to the process or the plant’s objectives. Avoid putting too many items on the audit. • Continuously improve the audit process (living document). 20% Scrap Reduction Goal

  7. Benefits of LPA’s • Multiple layers verifying critical processes are ready to go. (Rib Angle) • Gives management a reason to be on the floor. Makes management presence on floor commonplace. • Ensures problem solving solutions (corrective actions) stay in place. • Identifies problems upstream, before issue reaches customer. • Generates continuous improvement opportunities. 20% Scrap Reduction Goal

  8. Roadblocks to LPA’s • Culture shift in some cases to have associates do audits each shift and have management looking over their shoulder. • Too many items on LPA, makes it impossible task • Can become rubber stamp process. • Managers get busy and don’t follow through on audit, undermining audit importance. 20% Scrap Reduction Goal

  9. Roadblocks to LPA’s • Nothing done with the data • Verification of LPA item not clear to everyone (different interpretation of OK) 20% Scrap Reduction Goal

  10. Questions 20% Scrap Reduction Goal