UPCCA is option for public entities. Reduces restrictions on Public Contract Code ProceduresHas some additional notifications, reporting and tracking proceduresRequires an annual advertisement for Contractors. Bidding Options. Public Contract Code ProceduresRFP, projects $0 to $15,000Formal bidding projects $15,000 and upUniform Public Construction Cost Accounting RFP, projects $0 to $25,000Informal bidding, projects $25,000 to $100,000May go up to $110,000 with 4/5 board approvalFormal9439
E N D
1. Uniform Public Construction Cost Accounting (UPCCA)
2. UPCCA is option for public entities Reduces restrictions on Public Contract Code Procedures
Has some additional notifications, reporting and tracking procedures
Requires an annual advertisement for Contractors
3. Bidding Options Public Contract Code Procedures
RFP, projects $0 to $15,000
Formal bidding projects $15,000 and up
Uniform Public Construction Cost Accounting
RFP, projects $0 to $25,000
Informal bidding, projects $25,000 to $100,000
May go up to $110,000 with 4/5 board approval
Formal bidding, projects $100,000 and up
4. Public Contract Code Procedures RFP, projects $0 to $15,000 Notice to Proposers identifying project, bid time/place and contacts.
Instructions to proposers detailing procedures during bidding.
Insurance, bonds if required
Prevailing wage requirements
Site examination
Taxes
5. Public Contract Code ProceduresFormal Bidding projects $15,000 and up Construction Documents
Project Manual (specs)
Plans
Advertisement to bid
Instructions to bidders
Insurance and bonds
Prevailing wage requirements
Site examination
Taxes
Liquidated damages if any
License requirements
6. Uniform Public ConstructionCost Accounting RFP, projects $0 to $25,000 Notice to Proposers identifying project, bid time/place and contacts.
Instructions to proposers detailing procedures during bidding.
Insurance, bonds if required
Prevailing wage requirements
Site examination
Taxes
7. Uniform Public ConstructionCost Accounting Informal projects $25,000 to $100,000 Construction Documents
Project Manual (specs)
Plans
Invitation to bid and listing in Trade Journals
Instructions to bidders
Insurance and bonds
Prevailing wage requirements
Site examination
Taxes
Liquidated damages if any
License requirements
8. Uniform Public ConstructionCost Accounting Formal Bidding projects $100,000 and up Construction Documents
Project Manual (specs)
Plans
Advertisement to bid
Instructions to bidders
Insurance and bonds
Prevailing wage requirements
Site examination
Taxes
Liquidated damages if any
License requirements
9. Uniform Public ConstructionCost Accounting - Auditing Project Based Accounting Required
Separate Audit for each project
Funding sources identified for each portion or portions of project
Budget for each portion of project
Already being done for all campus projects
Good business practice, regardless!
10. Uses of System Scheduled Maintenance
RFP to $25,000 for more small projects to local Contractors
Use informal bidding up to $100,000 for roofing, painting, ac paving and other SM work with only invitations to bid
Hazardous Materials
Works well for small abatement projects associated with local work
Local Projects
Small renovations and wall relocations work well as it allows you to work more smaller local contractors/vendors.
Can save time
Can shorten total delivery time
11. Questions from Contractors How do I get on the list?
Send a letter requesting to be on the informal bidder list of bidders.
How do I get notified about a project coming up?
You as a college are obligated to notify all informal bidders a minimum of 10 days before bids are due. How is bidding handled?
Just like normal bidding except the extra notification requirement.
How does this affect MBE/WBE?
No change, it is still only a census for each project that is tabulated on an annual basis.
Prevailing wage required?
Just like normal projects
12. Client Satisfaction Pros
District can do more work with RFP process up to $25,000, compared to $15,000 as allowed by PCC
Informal bidding allows shorter project delivery times
Informal bidding can reduce overall project delivery cost Cons
Paperwork of notifying trade journals as well as list of Contractors / Bidders on list
Compiling annual list of bidders
Notification requirement of trade journals 30 days prior to bid date on formal projects
Audit requirements
13. Does it work? Yes, but
Be prepared for more paperwork for bidding. The need to control the bidding system to allow proper notification i.e. trade journals etc.
You must keep an annual list of contractor and cannot control who is on it. You must notify every bidder on list that related to a project. Yes, but
Be prepared for questions from contractors asking to be on list that you do not like to work with. We have found out that most contractors do not know about the system and do not hear about your projects unless you want them to. This does give you some indirect control of who is on your list.
14. Summary of Requirements Adoption by Board of Trustees
Annual advertisement for Contractor Contacts
Trade Journal notifications
Expenditure audit trail by budget by project