An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Preparation of Lviv Airport to EURO’2012 04 February 2009

  2. Current outlook of International Airport “Lviv” Сonstructed in 1950th Capacity 300 PAX/H Runway 2500 m

  3. Host countries of EURO – 2012. Lviv has Strategic position The longest Distance to the farest Host City is 1200 km Gdansk POLAND Lviv UKRAINE Donetsk

  4. Lviv Airport location within City 1 Airport 2 City Centre 4 2 5 km (15-20 min) Stadium 3 7 km (20-30 min) Railway station 4 1 12 km (30 min) 3

  5. Project Organization Project Owner - Ministry of Transport Client – Lviv International Airport Sub -project Project Architect General Contractor Consultant

  6. Project Scope of Airport reconstruction 5 3 4 2 2 1.2 1.1 2 510 m 2 3 200 m • 1. Reconstruction, extension of the runway: • 1.1 Extension of the runway. • 1.2 Reconstruction of the runway (strengthening of the existing pavement) • Reconstruction of the apron • Reconstruction of the existing air terminal • Construction of the new passenger terminal • Existing hotel 1 1.1 1.2 2 3 4 5

  7. Master plan of Airport and surrounding Territory 3 5 3 4 2 5 1 • Existing Terminal • NewTerminal • Hotels • Parking • Service Centers

  8. Time Schedule for Reconstruction of Runway and Apron Progress End 2011 Now Before 3 March 2009 4 March 2009 Reconstruction END Reconstruction START Design is finished and approved Selection of General contractor

  9. Key Data for new Terminal • New Terminal Building (34,000 m2) category ‘C’, in compliance with requirements of ICAO and IATA • Capacity - 1000 passengers per hour

  10. New Terminal building Progress End 2010 Now 27 March 2009 4 May 2009 Building END Building START New terminal design in progress Design will be completed

  11. Financing (current status) • Reconstruction of Runway - 27,2 mln.Euro (State Budget) • Reconstruction of Apron - 16,9 mln. Euro (State Budget) • Reconstruction of existing terminal - 12,6 mln. Euro (State Budget) • Construction of New terminal – 90,0 mln. Euro (Investor )

  12. Reserve Airports Lutsk Розміщення резервних аеропортів 152 кm Lviv 135 кm Ivano-Frankivsk

  13. Welcome to Lviv in 2012!