1 / 11

Steps to Take After Sealcoating Is Complete

If you are considering asphalt sealcoating in Toronto, the benefits can last for years with proper care and maintenance. Continue reading to learn how a few simple steps can extend the integrity of the sealcoat and underlying asphalt. <br><br>

Sure2
Download Presentation

Steps to Take After Sealcoating Is Complete

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SURE SEAL MAINTENANCE PAVEMENT INC. Steps to Take After Sealcoating Is Complete

  2. Continue Reading To Learn A Few Simple Steps If you are considering asphalt sealcoating in Toronto, the benefits can last for years with proper care and maintenance. Continue reading to learn how a few simple steps can extend the integrity of the sealcoat and underlying asphalt.

  3. Keep Off the Pavement • Sealcoat requires time to cure and dry before the surface can be used. The air temperature can have a significant impact on the drying time as heat promotes the curing process. • With temperatures above 15 degrees Celsius, wait 24 hours before foot and vehicle traffic is allowed on the pavement. If the average temperature is between 7 to 10 degrees Celsius, the recommended time to cure is 36 to 48 hours.

  4. Block Off Your Parking Lot • Before and after sealcoating a parking lot, use barriers such as cones, tape, or railings to block off the area. As the asphalt surface needs to be properly cleaned and free of debris during the sealcoat application, blocking the area can prevent pedestrians and vehicles from damaging the surface before the curing and drying time is complete.

  5. Paint the Surface with New Parking Lot Lines • Sealcoating is an important maintenance tool for an asphalt paved parking lot. • The existing painted lines will be covered over by the black material of the sealcoat. Once the sealcoat has dried and cured, restripe the appropriate areas of the lot to maintain traffic flow when permitted on the surface again.

  6. Check the Surface to Avoid Any Asphalt Cracks • Once the sealcoat is dried, continue with regular checks of the asphalt. Weather conditions, weight of traffic, and chemical spills can severely damage the top layer causing cracks to form. • Water and moisture from rain and snow can expand these cracks allowing the underlying asphalt to become damaged.

  7. Clean the Stains • Even with the highest quality of sealcoat used by a commercial asphalt sealing company in Toronto, the sealcoat layer is susceptible to the effects of fuel, oil, and other fluids. • If any spills are discovered during pavement checks, address them as soon as possible with a proper degreaser substance to remove the stains.

  8. Prepare for the Winter • De-icer products may work for pathways and roads, but it can damage the integrity of the sealcoat material. Use sand to address icy patches on the sealcoat for traction without breaking down the components of the material.

  9. Also Read • https://www.suresealpavement.com/steps-to-take-after-sealcoating-complete/ • https://www.suresealpavement.com/how-long-does-sealcoating-take-to-dry/ • https://www.suresealpavement.com/5-important-questions-to-ask-before-sealcoating-your-asphalt-pavement/ • https://www.suresealpavement.com/questions-to-ask-before-sealcoating-parking-lot/

  10. Contact Us Address: 40 Humberline Drive,Toronto, ON Canada,M9W 5X1 Phone Number: 416-410-3705 Email: info@suresealpavement.com

  11. Thank You!!

More Related