1 / 32

Aviation Meteorology A Northwest Airlines Perspective

Aviation Meteorology A Northwest Airlines Perspective. Tom Fahey, Manager Meteorology American Meteorological Society - Memphis Chapter 20 September 2005 Memphis, TN. Northwest Airlines Perspective. General Introduction to NWA NWA System Operations Control

Thomas
Download Presentation

Aviation Meteorology A Northwest Airlines Perspective

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Aviation MeteorologyA Northwest Airlines Perspective Tom Fahey, Manager Meteorology American Meteorological Society - Memphis Chapter 20 September 2005 Memphis, TN

  2. Northwest Airlines Perspective • General Introduction to NWA • NWA System Operations Control • NWA Meteorology Roles and Products

  3. Northwest & KLM Alliance 1990’s

  4. 2004 NWA - Member of SkyTeam

  5. TheSOC

  6. NWASystem Operations Control SOC •Crew Coord. •Customer Svc •Flight Dispatch •Load Control •Maintenance •Meteorology •Navigation Data •Ops Planning •Ops Analysis •Perf Engineering Implement, Mitigate &/or Recover

  7. SOC - ResponsibilitiesFocus on “Day of Operation” 2 Main Causes of Flight Schedule Disruptions • Maintenance • Weather SOC will take action based on 12hr Fcst - Not a 2 day Fcst

  8. NWA Meteorology Roles • Support Efficiency • Support Safety • Deliver Useful Products & Services

  9. NWA Meteorology RolesA Historical Perspective • 1985 Route Selection & Wind Fcsting • 1990Terminal Forecasting & Verification • 1995 Fcsts Supporting Stn Deicing • 2000 En Route Tstrms & Air Traffic Mgmnt • 2000 Tropical Strm Fcst Supporting Stn Ops • 1985-2005 Fcsts For Turbc Avoidance

  10. Operational Efficiency

  11. Operational EfficiencyNWA Historical Perspective • 1980’s Flight Planning for En Route • Manual Wind Forecasts by Meteorologist • Route Selection by Meteorologist • 1990’s Terminal Area Operations • Individual Flight Focus • Currently 3 TAF’s by NWA & Rest from NWS • Mid 1990 - Current System Efficiency • CDM (Collaborative Decision Making)

  12. CCFP (Collaborative Convective Forecast Product) • 1998 Test Lead by NWA • 1999 Operational @NWS AWC • Since 2003 Issued every 2 hrs • 2, 4, & 6 Hour Fcsts • Used by Traffic Flow Mngmnt • Collaborative Forecast • CWSU’s @ FAA ARTCC’s • Environment Canada • Airline Meteorologists • NWS AWC

  13. CCFP CCFP Purpose: Identify En Route Airspace Impacted Significantly.

  14. Collaborative Decision MakingTstrm Routing - Terminal Area • Flt Dispatchers & Pilots @ an Airline and Air Traffic Managers @ FAA & Airline use Fcsts & Obs to decide on routes around tstrms when departing an airport.

  15. Safety&Efficiency

  16. NWA Meteorology Products • Fcsts Supporting Safety & Efficiency • Air Traffic Management During Convection • Station Ops During Deicing • Station Ops During Tropical Activity • Clear Air &Terrain Induced Turbc Avoidance

  17. Preflight Routing-Tstrm Avoid • Preferred Route for time & burn.

  18. Preflight Routing-Tstrm Avoid • White Line most days. Green Line today.

  19. Station Ops During Deicing Name this Airport: AMS ? DTW ? IND ? MEM ? MKE ? MSP ? NRT ? Meteorology Fcsts for 5 NWA hub airports - Which Ones?

  20. Aviation Safety Requires Deicing

  21. Deicing Fcsts Support Efficiency • Decision Support • Staffing • Equipment Prep • Flight Thinning What Station?

  22. Winter Weather Depiction Covers 5 Hub areas & E. Coast stns

  23. Tropical Weather Depiction Also Issued for East Pacific (btwn Mexico & HNL), Asia Pacific & India

  24. Clear & Mtn Wave Turbulence Avoidance • NWA’s Turbulence Plot System • Meteorologist Forecasting Procedures • Preflight Graphics & Outlooks • For Route Selection by Dispatchers • En Route Updates to Dispatchers & Pilots

  25. . Vertical Propagating Breaking Waves 1. 700mb wind >30kts - wave develops 2. Wave begins to propagate vertically if 500mb/700mb wind ratio 1.5-2.0 & Stable layer at or near Mtn peaks 3. Heights begin packing near surface 4. Upper level waves reach tropopause & begin to break and reflect back down 5. Downslope windstorm ensues. 4. 2. Waves: Step 1 Starts @ Mt Peaks 1. 700mb 3. 5. Step 2 & 3 Develops Vertically

  26. Mtn Wave Fcst Procedures Model Turbulence (+) Mountain top Stable layer Severe Rotor turb 2 Layers of Focus Vertically propagating Breaking mountain wave

  27. Preflight GraphicsA General OverviewCAT & Mtn Waves

  28. The Turbulence Plot Messages Dispatchers’ Tool ASD • The Details • Continuous Updates • Preflight Graphics • For Pilot & Dispatcher • En Route Updates • For Dispatcher & Text for Pilot •8 Hazards Including Including Clear & Mtn Wave Turbc

  29. Pilots’ Tool Web Wx The Turbulence Plot Messages

  30. Conclusion

  31. Safety & Efficiency • • Driven by Conditions at Airport & TAF • - TAF Ceiling & Visibility: Require Fuel for an Alternate • - Airport Congestion: Snow, Tstrms or Wind Velocity • • Driven by Conditions En Route • Air Traffic Mngmt & Congestion During Convection • Clear Air &Terrain Induced Turbce Avoidance • Convection Hazard Avoidance •  Fuel Loading Decisions

  32. Questions?

More Related