MASTER OF BUSINESS (ELECTRONIC COMMERCE) EC 691 – Business Project

MASTER OF BUSINESS (ELECTRONIC COMMERCE) EC 691 – Business Project. Deliverable 6: Group Presentation Develop Online Tutorial Class for Primary School Student for  SUN-TECH BUSINESS SYSTEMS LIMITED. Team Members: CHIU King Ho, Anthony (12163953 ) DON Sheung Yiu, Manfield (12164147)

Thomas
Download Presentation

MASTER OF BUSINESS (ELECTRONIC COMMERCE) EC 691 – Business Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MASTER OF BUSINESS (ELECTRONIC COMMERCE) EC 691 – Business Project Deliverable 6: Group Presentation Develop Online Tutorial Class for Primary School Student for  SUN-TECH BUSINESS SYSTEMS LIMITED Team Members: CHIU King Ho, Anthony (12163953 ) DON Sheung Yiu, Manfield (12164147) HO Tat Ming, Max (12164079) LAM Siu Yee, Judy (12162183) LUI Lai Mui, Polly (12162523) To: Pf. David Egan Dr. Martin West Dr. Danny Kilis By: Team Innovation Logo Source: Curtin University, Sun-tech Business Systems Ltd. EC 691 - Business Project

  2. Introduction Job Allocation EC 691 - Business Project

  3. Introduction Client Background…(Introduction) EC 691 - Business Project

  4. Before Intervention EC 691 - Business Project

  5. Before Intervention Understand all external entities; Study the relationship between different entities and internal functions; Formulate the environmental context diagram; Formulate the Functional Context Diagram Develop the Area of Concern The First stage is to develop the area of concern by following steps : Source: System Development SD503 Curtin University. EC 691 - Business Project

  6. Literature Review • AREAS OF REVIEW • ACTIONRESEARCH • EPISTEMOLOGICAL VIEW • CHANGE MANAGEMENT EC 691 - Business Project

  7. Literature Review (Jayaratna, 1994) EC 691 - Business Project

  8. Literature Review ACTION RESEARCH “A family of research methodologies which pursue action (or change) and research (or understanding) at the same time” (Dick, Bob 1999) EC 691 - Business Project

  9. Literature Review (Kemmis, cited in Dorothyt 1995) EC 691 - Business Project

  10. Literature Review (Grant, 1996) EC 691 - Business Project

  11. Literature Review (Adapted from Sinclair, 1994) EC 691 - Business Project

  12. Literature Review (Grant, 1996) EC 691 - Business Project

  13. During Intervention EC 691 - Business Project

  14. After Intervention System Infrastructure • Learning Management System (LMS) • Content Development • Virtual class • e-Interview • Self-paced exercise • Collaboration i-Tutoring solutions to students Content Development LMS LMS Registration, tracking, virtual class, assessment and reporting.

  15. After Intervention Learning Management System (LMS) Features: • Registration and enrolment • Class scheduling • Self-paced exercise • Assessment • Learning History Tracking • Reporting • Chat room • Live events • Management

  16. After Intervention Learning Management System (LMS) Two Options available: • Hosting model • Installed model

  17. After Intervention Hosting Architecture Hosting vendor LMS and data centre Internet database Server Sun-Tech Content server

  18. After Intervention Installed Architecture Sun-Tech data centre Internet Server and content server

  19. After Intervention Hosting vs. Installed Model

  20. After Intervention Issues arise • Different opinions on Hosting vs. Installed model • Easy to jump to conclusion of using Hosting model due to: • low investment costs • Easy maintenance • quick implementation

  21. After Intervention Problems resolving approach Proposed solution Different perceptions • Hosting solution • Installed solution make changes • Share our views • Discuss with Team Supervisor • Continue to do research Research Analysi & Reflection • Analyze research results • Sun-Tech’s value chain • Gain insights

  22. After Intervention EC 691 - Business Project

  23. Conclusion EC 691 - Business Project