An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Fort Yukon Wood Energy Project Project Update 14 January 2010

  2. Community Based Program Wood Heat Feasibility • Assessed forests resource 2006-7 • Assessed fuels use 2007-8 • Assessed current technologies 2006-9 • Conducted a Feasibility Study 2008 • Marketed concept & secured funding 2006-9 • Developed an integrated model

  3. Current Funding Phase 3 • Fully Funded • Phase 3 final design, permitting, environmental assessment, energy sales agreements, landownership agreements • CATG $210K from DOE requires $210K match • GZ Utility $210K from AEA requires $210K match • GZ $300,000 in reserve

  4. Other Funds & Activities • Alaska Village Initiatives: • Full Financial Analysis and Business Plan • Forest Inventory – TCC Forestry • 5 Year Harvest Plan • GZ Board Training & Business Development • Forest Harvest Training

  5. Tasks to be PerformedPhase 3 • Project Planning Workshop • GZ Business Board Training • CATG/TCC development of a GIS Forest Inventory • Forest harvest plan • 35% Boiler System Design • Final boiler, construction, piping design • Boiler permitting process • Landownership agreements and donations

  6. Phase 3 tasks continued • Environmental Assessment • Power sales agreements • Harvest Equipment Purchase and Delivery • Wood Yard, Wood Storage and Haul rd development • EQIP Contract for $450,000

  7. For-Profit Wood Energy Business Model Fort Yukon • Forest Management Service – CATG • For-Profit Wood Utility Company – Vertically Integrated • Gwitchyaa Zhee Native Corporation • Wood Harvest • Village Wood Yard • Wood Energy Utility – Diesel/Biomass

  8. Construction Funds • Phase 4 - Construction • CATG $990K from DOE requires equal match – NF • GZ $805K from Denali/AEA requires equal match • Total project is $3.6 million • Have $1.795 million – needed $1.8 million • Applied for $2.5 million from AEA Renewable Energy Fund

  9. Site Comparison for District Heat System