1 / 7

Documentation Control and Quality Control

Documentation Control and Quality Control. Presented by Shane Tyler and Gary Russell. Maintaining ATEX Certification on the Sage Rio Mass Flow Meter. Procedures and Documentation ATEX NIST Traceability Weekly Quality Meetings

abedi
Download Presentation

Documentation Control and Quality Control

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Documentation Control and Quality Control Presented by Shane Tyler and Gary Russell

  2. Maintaining ATEX Certification on the Sage Rio Mass Flow Meter • Procedures and Documentation • ATEX NIST Traceability • Weekly Quality Meetings • QC and Final Testing (including Helium leak check on ALL volatile gases) • Commitment to Quality

  3. Procedures and Documentation for Maintaining ATEX Certification • Various documents including assembly procedures to engineering meeting notes are being used to maintain this standard • Document database and drawing database are beginning to intertwine for stronger traceability of parts used in construction of Rio

  4. ATEX NIST Traceability • All of our calibration equipment and test instruments are calibrated through Transcat Metrology Services • All calibration sheets are filed and re-calibration dates are noted by Document Control • Any mechanical changes to Sage Rio must be pre-approved by TUV before being fully released in house

  5. Weekly Quality Meetings • Quality meetings are held every Monday morning at 9:00am • Quality Group has helped to streamline processes as well as help keep the company on task for delivering a quality product

  6. QC and Final Testing • Final QC checks the meter for any defects not found during assembly (this includes paperwork as well as accessories) • Leak Testing using Helium leak detector Final QC checks Insertion type meters for leaks between enclosure and sensor head

  7. Commitment to Quality • ATEX Certification only the beginning in demonstrating Sage quality • Developing Incoming QC Checks on ATEX parts

More Related