1 / 1

The EPA Regulatory Train Wreck: Regulatory Timeline for Coal-Fueled Power Plants

' 11. ' 12. ' 13. ' 16. ' 15. ' 17. ' 08. ' 09. ' 10. ' 14. The EPA Regulatory Train Wreck: Regulatory Timeline for Coal-Fueled Power Plants. Ozone. SO 2 /NO 2. CAIR. Water. Beginning CAIR Phase I Seasonal NOx Cap. SO 2 Primary NAAQS . Revised Ozone NAAQS.

abel
Download Presentation

The EPA Regulatory Train Wreck: Regulatory Timeline for Coal-Fueled Power Plants

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. '11 '12 '13 '16 '15 '17 '08 '09 '10 '14 The EPA Regulatory Train Wreck: Regulatory Timeline for Coal-Fueled Power Plants Ozone SO2/NO2 CAIR Water Beginning CAIR Phase I Seasonal NOx Cap SO2 Primary NAAQS Revised Ozone NAAQS Reconsidered Ozone NAAQS Effluent Guidelines Final rule expected Effluent Guidelines Compliance 3-5 yrs after final rule Proposed CAIR Replacement Rule Expected SO2/NO2 Secondary NAAQS Next Ozone NAAQS Revision Final CAIR Replacement Rule Expected CAIR Vacated 316(b) Compliance 3-4 yrs after final rule Effluent Guidelines proposed rule expected 316(b) final rule expected CAIR Remanded NO2 Primary NAAQS CO2 Regulation PM-2.5 SIPs due (‘06) Begin CAIR Phase I Annual SO2 Cap PM-2.5 SIPs due (‘97) Next PM-2.5 NAAQS Revision Beginning CAIR Phase II Annual SO2 & NOx Caps Begin CAIR Phase I Annual NOx Cap Final Rule for CCBs Mgmt New PM-2.5 NAAQS Designations Beginning CAIR Phase II Seasonal NOx Cap CAMR & Delisting Rule vacated HAPS MACT final rule expected Begin Compliance Requirements under Final CCB Rule (ground water monitoring, double monitors, closure, dry ash conversion) HAPS MACT Compliance 3 yrs after final rule Compliance with CAIR Replacement Rule HAPs MACT proposed rule Proposed Rule for CCBs Management Final EPA Nonattainment Designations 316(b) proposed rule expected PM2.5 Ash Hg/HAPS CO2 1

More Related