1 / 36

Recent developments at DMI Jacob Brock jbb@dmi.dk

Recent developments at DMI Jacob Brock jbb@dmi.dk. Weather, climate and sea. Recent developments at DMI. An administrative change NinJo: Operational introduction and continued development A new supercomputer Road Weather Information System Graphical Production System.

abia
Download Presentation

Recent developments at DMI Jacob Brock jbb@dmi.dk

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Recent developments at DMI Jacob Brock jbb@dmi.dk Weather, climate and sea

  2. Recent developments at DMI • An administrative change • NinJo: Operational introduction and continued development • A new supercomputer • Road Weather Information System • Graphical Production System

  3. An administrative change

  4. NinJo

  5. NinJo • Deployed operationally Dec 2006 • 4 data types: • Observations • Model data (HIRLAM) • Radar • Satellite • In parallel with old system

  6. NinJo • Lightning data, more models added • Experiences (subjective) • Younger users more likely to use NinJo • Good super users gives better acceptance • Don’t try to limit the users

  7. AalOpr SkpOpr ResOpr KarupOpr LyvOpr LyvTre LyvDev LyvTest LyvLocal

  8. New supercomputer

  9. Supercomputer • Replacing the current NEC SX6 with a Cray in 4 steps: • An XT4 as an ”early migration system” in parallel with the NEC has been installed • The XT4 takes over all applications and the NEC is closed down (scheduled 16 July) • The NEC is disassembled and a Cray XT5 put in instead • The XT5 to be turned on late october and take over all applications before the end of the year

  10. Cray XT: Homogenous Architecture, scalable nodes

  11. Supercomputer • Software • - loginnodes have full SuSE Enterprise Linux • - compute nodes have Compute Node Linux (speciel kernel and version of SuSE) • - third party compilers, amongst others PGI, PathScale, Gnu GCC • Cost • - Cray XT4/5, 6 million € • - refurbishing of machine hall ~450.000 € • - other costs ~65.000 €

  12. XT4 ”Odin”

  13. Road Weather Information System

  14. Road Weather Information System • Once it was MFC C++ • Then it became JavaScript • But that was too slow so… • Now reimplemented in pure Java, using Java WebStart for updgrading

  15. The Challenge: Provide complex meteorological information in a non-complex format The Construction Syndicate: Road People Weather People IT People The Users: Basicly everyone with interests in slippery road conditions…

  16. User spectre : Owner of truck or shovel, may have drivers license Engineer, who is a full time computer- and weathernerd • The Users: • Basicly everyone with interests in slippery road conditions : • Road authorities, State, Region, Community, City…. • Entrepreneurs • Airports • Harbours • Hospitals • Other authorities • …

  17. Local map Current condition Forecast status 5 hours

  18. Longforecast ~330 stations !

  19. Area forecast Comments from meteorologist

  20. Radar images (Precipitation) Rain Mix Snow FRZ precip

  21. Web-cams

  22. The system is continously improved • Feed-back from users • Performance continuously verified • Day seminar every year • Next season: Exchanging data with Schleswig – Holstein (Northern Germany)

  23. Graphical Production System

  24. Graphical Production System • So far based on a locally developed program • Written in MFC C++, no further development • Can only generate pixel-based images • Does not scale very well • New product = new extraction + new graphics + new dissemination

  25. Graphical Production System • Requirements for new system • Based on common standards • Deliver both pixel and vector graphics • Illustrator CS-series chosen • Be scalable • Common products for many customers

  26. Graphical Production System Database Production application Data + prod. Req. Illustrator CS Product Post processing

  27. Graphical production

  28. Recent developments at DMI Jacob Brock jbb@dmi.dk Weather, climate and sea

More Related