Introduction Heinz-Dieter Nuhn, SLAC / SSRL September 22, 2004

Introduction Heinz-Dieter Nuhn, SLAC / SSRL September 22, 2004. Workshop Presentations Expected Outcome Few Organizational Details. LCLS Commissioning Workshops. Undulator Diagnostics and Commissioning Workshop January 19-20, 2004, UCLA

abram
Download Presentation

Introduction Heinz-Dieter Nuhn, SLAC / SSRL September 22, 2004

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IntroductionHeinz-Dieter Nuhn, SLAC / SSRLSeptember 22, 2004 • Workshop Presentations • Expected Outcome • Few Organizational Details Heinz-Dieter Nuhn, SLAC / SSRL

  2. LCLS Commissioning Workshops • Undulator Diagnostics and Commissioning Workshop • January 19-20, 2004, UCLA • URL: http://www-ssrl.slac.stanford.edu/lcls/undulator/meetings/2004-01-19_diagnostics_comissioning/ • Report:http://www-ssrl.slac.stanford.edu/lcls/workshops/2004-09-22_diag_comm/lcls-tn-04-2.pdf • LCLS Diagnostics and Commissioning Workshop • September 22-23, 2004, SLAC • URL: http://www-ssrl.slac.stanford.edu/lcls/workshops/2004-09-22_diag_comm/ Heinz-Dieter Nuhn, SLAC / SSRL

  3. Workshop Presentations • Charge – J. Galayda • Welcome – C. Pellegrini • Workshop Introduction – H.-D. Nuhn • LCLS Commissioning Schedule and Milestones – J. Welch • Injector, Linac and Undulator Diagnostics and BPMs – P. Krejcik • Injector Commissioning Plans – C. Limborg • Linac Commissioning Plans – P. Emma • Undulator / FEL Commissioning Plans – H.-D. Nuhn • X-Ray Transport Commissioning Plans – R. Bionta • Summary of Related Topics from the XFEL2004 Workshop – J. Arthur • User Requirements – J. Hastings • Microbunching Diagnostics –A. Lumpkin / W. Fawley • Controls and Data Acquisition – B. Dalesio / D. Koturri / P. Krejcik • Online Data Analysis and Simulations – S. Reiche • High Resolution Effective K Measurements Using Spontaneous Undulator Radiation – B. Yang • Weak FEL Signal Detection Using a Slowly Modulated Laser-Heater – P. Emma • Summary and Final Discussion – J. Galayda Wednesday Thursday Heinz-Dieter Nuhn, SLAC / SSRL

  4. Expected Workshop Outcome • Resulting Document:“LCLS Beam Commissioning” • Target Date: October 2004 • Purpose • Basis for Starting R&D for Commissioning Diagnostics Speakers are asked to send in a written summary as soon as possible A few paragraphs to a few pages in length. Heinz-Dieter Nuhn, SLAC / SSRL

  5. Coffee and Lunch Breaks • Coffee Breaks: There will be three coffee breaks during which coffee, pastries and cookies will be served. • Lunch Breaks: Lunch will not be provided by the workshop. The lunch breaks should provide enough time for getting lunch at the SLAC Cafeteria or one of the nearby restaurants. Heinz-Dieter Nuhn, SLAC / SSRL

  6. Conclusions • This is the second of a series of workshops to prepare the commissioning of the LCLS. • Workshop goal is to provide input for the preparation of the LCLS commissioning plan. • Workshop results will be summarized in workshop report. Heinz-Dieter Nuhn, SLAC / SSRL

  7. End of Presentation Heinz-Dieter Nuhn, SLAC / SSRL