IDS Project

IDS Project. Update on Human Factors and Simulation (Geometry Completed). Human Factors. Analyze problem Task analysis “What are drivers doing wrong?” “Who is at most risk?” Driver model (Information Process) “Why are they doing it wrong?”

acarreiro
Download Presentation

IDS Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IDS Project Update on Human Factors and Simulation (Geometry Completed)

  2. Human Factors • Analyze problem • Task analysis • “What are drivers doing wrong?” • “Who is at most risk?” • Driver model (Information Process) • “Why are they doing it wrong?” • “What information could support correct behavior?” • Previous solutions • “What has not worked before?” • Simulate case site • Propose interfaces and simulate candidate • Evaluate candidate interface

  3. Task Analysis • Detect intersection • Decelerate and enter correct lane • Signal if intending to turn • Detect and interpret traffic control device • Detect traffic and pedestrians • Detect, perceive, and monitor gaps • Accept gap and complete maneuver • Continue to monitor intersection

  4. Human factors issues • In Minnesota, most drivers stop before proceeding (Preston & Storm, 2003) • 57% stopped in 2296 rural thru-STOP accidents • 87% of right angle crashes at US 52 and CSAH 9 occurred after the driver stopped • Suggests drivers have problem • Detecting gaps • Perceiving gaps • Judging gaps

  5. Information Needs • Vehicle Detection • Convey speed/distance/arrival time • Measure/convey gap • Judge “safe gap”, display location

  6. High Risk • Older drivers (> 65 years) have a high crash risk at intersections • Drivers > 75 years had greatest accident involvement ratio (Stamatiadis et al., 1991) • Drivers > 65 years 3 to 7 times more likely to be in a fatal intersection crash (Preusser et al., 1998) • Drivers > 65 years over-represented in crashes at many rural intersections in Minnesota (Preston & Storm, 2003)

  7. Collision Countermeasure System Prince William Co., Virginia • Thru-STOP at two 2-lane roads • Focus on warning major approach • Data Collected: • Speed (intersection arrival, reduction) • Projected time to collision (PTC)

  8. Human machine interface evaluated forCollision Countermeasure System (CCS)Prince William County, Virginia • Aden road (major) & Fleetwood Drive (minor) intersection located on plateau with restricted sight distances. • Drivers on minor leg often had difficulty sensing safe gap On minor leg On major leg

  9. Collision Countermeasure System (minor approach) (major approach)

  10. Intersection Collision Avoidance Warning System Norridgewock, Maine • Thru-STOP at two 2-lane roads • Focus on warning minor approach • Data: • Observational techniques • Surveys

  11. Limited Sight Distance Warning Signs Gwinnett County, Georgia • 18 Thru-STOPs at two 2-lane roads • Chosen based on minimum sight distance guidelines & reported problems • Warnings for major &/or minor approaches • Signs considered interim solution

  12. STOP

  13. Relevant ITS Concept- COMPANION • Two 2-lane, One 3-lane highway • Variable flashing modes depending on hazard

  14. COMPANION • Manually activated (for study) • Simulated truck break-down • Results: • Reduction in speed • Harmonization of speed over lanes • Reduction in all types of crashes • Greater effects for drivers in slow lanes

  15. Simulation • Construction Data (TH52 and CSAH9) • Road geometry • Elevation profile • Ditch Profile • Digital Elevation Model (50m) • Field and terrain • Onsite survey • Furniture • Reality check

  16. Time Constraints • Compression of project time line necessitated (1) parallel tasks, and (2) reduced effort for realism. • Focus was given to target site within simulated “loop”. • Emphasis on geometry.

  17. Actual

  18. Simulated

  19. Next Step • Interface proposals generated. • *Collect comments from experts. • Collate and nominate interface candidate. • Simulate candidate. • Design experiment. • Simulate scenario. • *Pilot study. • Conduct study • Analyze and report.