MidSTAR II United States Naval Academy Small Satellite Program Prof. Billy R. Smith, Jr., PhD Director. Universe of SERB-Approved Payloads.

acton
Download Presentation

Universe of SERB-Approved Payloads

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MidSTAR IIUnited States Naval AcademySmall Satellite ProgramProf. Billy R. Smith, Jr., PhDDirector

  2. Universe of SERB-Approved Payloads • Mission requirements have been chosen with the intent of accommodating as many SERB-approved payloads as possible. The 2005 SERB List was subjected to a frequency analysis to determine a range of values that MIDSTAR could support: • 300,000 cm3 of volume accommodates 80% of experiments; • 80 kg, the mass limit for mod 2, accommodates 70% of experiments; • 100W average power accommodates 70% of experiments; and • 100 kbps data rate satisfies 90% of experiments. • The baseline configuration of MidSTAR-class satellites will assume maximum capacity in all onboard systems. Trade-offs will be made in the design of specific spacecraft as necessary to meet the needs of the payloads manifested.

  3. Securing a Launch • Acquire manifest on DOD Space Test Program (STP) funded launch vehicle • Must carry payload(s) or experiment(s) on current SERB list • STP is authorized to procure s/c to support experiments • Other experiments welcomed on no-cost/no-interference/resources-available basis • Three possible launch windows • MidSTAR-2 Lite: Defense Meteorological Satellite Program (DMSP) -19 FY09 • MidSTAR-2 Professional Edition: STP-2 FY10 or DMSP-20 FY11 • DMSP orbits: 830-km, sun-synchronous (99 deg inclination)

  4. MidSTAR-1 Manifest • Launch vehicle: STP-1 Atlas V, projected launch date 2 Nov 2006 • SERB Payloads • Internet Communications Satellite (ICSat) (USNA Aero Dept) • Configurable Fault Tolerant Processor (CFTP) (Naval Postgraduate School) • Other Payloads • MicroDosimeter NanoSensor Experiment (MiDN) (USNA Aero Dept and US Space Biological Research Institute) • MicroElectroMechanical Sensor Experiment (MEMS) (USNA EE Dept and Johns Hopkins Applied Physics Laboratory) • NanoChem Sensor Unit (NCSU) (NASA Ames Research Center) • Eclipse (Eclipse Energy Systems, Inc. and NASA Goddard Space Flight Center)

  5. 38in 28 in

  6. Assembly

  7. MidSTAR I Characteristics • Obeys the physical, electrical and environmental constraints of the ESPA ring; • Linux PC-based Command & Data Handling (C&DH) System with open source software • Uplink and downlink frequencies in military spectrum (Uplink: 1.767 GHz, downlink 2.20226 GHz) • 68.4 kbps or better GMSK • 39 V Power at 25 W average

  8. MidSTAR II Mission Statement • Support primary STP mission for two years; support additional USNA and NASA experiments for two years; demonstrate additional space operation capability such as attitude control, redundant power systems, or light sensing.

  9. Design Improvement • Possible Mission improvements are: • Reduce the overall mass • Dual redundant power system • Improved Thermal control • S/C to S/C link with MidSTAR-1 • Attitude Control • Onboard Ethernet-based Local Area Network (LAN)

  10. MidSTAR II Success criteria • 100% success requires: • Support of primary and secondary science payloads for two years • Repeated, successful demonstration in space of one advanced operation capability such as: Attitude control Thermal control Low resolution camera S/C to S/C link with MidSTAR-2

  11. MidSTAR II Success criteria • 50% Success criteria: • Support of primary and secondary science payloads for two years • Single successful demonstration of advanced operation capability • 25% Success criteria: • Support of primary payload for sufficient length of time to gather significant reducible data for payload owner

  12. Mission Timeline