Integration Studies at Points 7, 1 & 5 Available Space and Possibilities. Jean-Pierre Corso - CERN 14 th November 2012. 2 nd HiLumi LHC-LARP Frascati. EDMS No 1249553. Outline. LHC Quick Overview Links at Point 7 (DFBA) Links at Point 1 (DFBX) Links at Point 5 (DFBX).
E N D
Integration Studies at Points 7, 1 & 5Available Space and Possibilities Jean-Pierre Corso - CERN 14th November 2012 2ndHiLumi LHC-LARP Frascati EDMS No 1249553
Outline • LHC Quick Overview • Links at Point 7 (DFBA) • Links at Point 1 (DFBX) • Links at Point 5 (DFBX) 2nd HiLumi LHC-LARP Frascati
LHC Quick Overview Point 7 Point 5 Point 1 2nd HiLumi LHC-LARP Frascati
Links at Point 7 • Situation of the area • Limitations • Available space for HiLumi 2nd HiLumi LHC-LARP Frascati
Situation of Point 7 IP7 2nd HiLumi LHC-LARP Frascati
Situation of Point 7 191m Shaft PM76 LHC TZ76 LHC LHC LHC 2nd HiLumi LHC-LARP Frascati
Limitations of Point 7 • PM76 lift access • 1000kg max. • 900 x 1950 x 2500 (w,d,h) • Tunnel access • Width: 1050mm into TZ76 • Height: 2020 into UJ76 • 3 chicanes to pass into UJ76 !!! LHC Tunnel UJ76 TZ76 2nd HiLumi LHC-LARP Frascati
Bottle Neck UJ76 TZ76 2nd HiLumi LHC-LARP Frascati
Bottle Neck UJ76 TZ76 UJ76 • Cables, Pipes coming from: • Surface towards UJ76 & Tunnel (2 sides) • Tunnel (2 sides) towards TZ76 • UJ76 towards TZ76 • And back… • Tunnel Ventilation • 2 wind collectors 1250 • 1 smoke extraction duct • 1 input duct TZ76 2nd HiLumi LHC-LARP Frascati
Bottle Neck UJ76 TZ76 (view from TZ76) 1 2 3 4 2nd HiLumi LHC-LARP Frascati
Links HiLumi Integration 2nd HiLumi LHC-LARP Frascati
Links HiLumi Integration RR77 R771 R771 2nd HiLumi LHC-LARP Frascati
Links HiLumi Integration R771 UJ76 UJ76 UJ76 R771 R771 2nd HiLumi LHC-LARP Frascati
Links HiLumi Integration UJ76 TZ76 UJ76 TZ76 UJ76 R771 R771 2nd HiLumi LHC-LARP Frascati
TZ76 Links HiLumi Integration UJ76 TZ76 UJ76 PM76 TZ76 PM76 UJ76 2nd HiLumi LHC-LARP Frascati
To Summarize Point 7… • Positive • 180 m available in the TZ76 • 1080x2800 section along those 180m • Challenging • Equipments must come from the tunnel • Then, towards UJ76 and existing TZ76 No More than 600x1600x2500 ! 2nd HiLumi LHC-LARP Frascati
Something like that… 2nd HiLumi LHC-LARP Frascati
Links at Point 1 • Overview of the area • HiLumi Link routing 2nd HiLumi LHC-LARP Frascati
Point 1 Surface Shaft PM15 2nd HiLumi LHC-LARP Frascati
Point 1 Surface & Underground Shaft PM15 DFBX DFBX 2nd HiLumi LHC-LARP Frascati
UJ14 Equipments in place IP1 UJ14 Q3 DFBX Warm D1 UJ13 2nd HiLumi LHC-LARP Frascati
UJ14 Equipments in place All the equipment should be installed in a new surface building. IP1 UJ14 IP1 2nd HiLumi LHC-LARP Frascati
UJ14 Routing link into UJ14 UJ14 IP1 New SC link should be installed to connect underground equipment machine and surface electrical equipment. Q2 RB14 2nd HiLumi LHC-LARP Frascati
UL14 Equipments in place SC linkcouldpass in thisgallery. UL14 1st Floor UL14 Ground Floor 2nd HiLumi LHC-LARP Frascati
US15-PM15 Routing link into US15/PM15 The two SC links pass in the shaft PM15. One from right side One fromleftside. top US15 UL16 UL14 2nd HiLumi LHC-LARP Frascati
Point 1 Surface Shaft PM15 2nd HiLumi LHC-LARP Frascati
SD1 Routing link into SD1 A waywillbefound for the two SC link. PM15 Door… 2nd HiLumi LHC-LARP Frascati
SD1 Equipments at Surface 2nd HiLumi LHC-LARP Frascati
SD1 Equipments at Surface All the equipmentsmovedfrom UJ14 and UJ16 shouldbeinstalled in this new surface building. 2nd HiLumi LHC-LARP Frascati
Links at Point 5 • Overview of the area • HiLumi Link routing 2nd HiLumi LHC-LARP Frascati
Point 5 Surface Shaft PM56 2nd HiLumi LHC-LARP Frascati
Point 5 Surface & Underground DFBX DFBX Shaft PM56 2nd HiLumi LHC-LARP Frascati
RZ54 Equipmentsin place Left Side IP5 2nd HiLumi LHC-LARP Frascati
RZ54 Routing link Left Side New shaft for SC Link Height ~85 meter 2nd HiLumi LHC-LARP Frascati
RZ54 Routing link Left Side Some equipment should be installed in a new surface building. See next slide. 2nd HiLumi LHC-LARP Frascati
RZ54 Point 5 Surface New Building Shaft PM56 Shaft PM54 2nd HiLumi LHC-LARP Frascati
UJ56 Equipments in place Right Side IP5 DFBX UJ56 Warm D1 Q3 IP5 UJ57 2nd HiLumi LHC-LARP Frascati
UJ56 Equipments in place Way for SC Link from surface to underground shouldbestudied. Someequipmentsshouldbe installed in a new surface building. No spacefoundyet. 2nd HiLumi LHC-LARP Frascati
RZ54 Point 5 Surface New Building * Somewhere, still to befound… Shaft PM56 Shaft PM54 2nd HiLumi LHC-LARP Frascati
Thanks for your Attention ! 14th November 2012 EDMS No 1249553