1 / 4

Group 7 Equipment Replacement

Group 7 Equipment Replacement. By: David Berdahl (Organizer) Joshua Warwick (Techie) Tony Nong (Summarizer). The Project. Public Transportation Bus Replacement. 7 Year Bus. 10 Year Bus. Two Scenarios. Scenario 1 Do we replace the bus at this time or do we keep using the one we have.

adamdaniel
Download Presentation

Group 7 Equipment Replacement

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Group 7Equipment Replacement By: David Berdahl (Organizer) Joshua Warwick (Techie) Tony Nong (Summarizer)

  2. The Project • Public Transportation Bus Replacement 7 Year Bus 10 Year Bus

  3. Two Scenarios • Scenario 1 • Do we replace the bus at this time or do we keep using the one we have. • Scenario 2 • The bus needs to be replaced and do we get a 7 or a 10 year service life bus.

  4. Information Gathering • Internet • Public Transit Agencies (RTA, City of Corona, Foothill Transit) • Private Transportation Companies • Bus Manufacturers

More Related