1 / 8

Evaluation of Guide Sign Fonts Pooled Fund Study

Evaluation of Guide Sign Fonts Pooled Fund Study. Janelle Anderson Tort Claims and Traffic Standards Engineer Minnesota Department of Transportation. Lead Agency – Mn/DOT. Partners Committed: MN, CA, FL, IA Duration: 24 Months 100% SP&R Approval

adamma
Download Presentation

Evaluation of Guide Sign Fonts Pooled Fund Study

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Evaluation ofGuide Sign Fonts Pooled Fund Study Janelle Anderson Tort Claims and Traffic Standards Engineer Minnesota Department of Transportation

  2. Lead Agency – Mn/DOT • Partners Committed: MN, CA, FL, IA • Duration: 24 Months • 100% SP&R Approval • Commitment to date: $120,000 of the $150,000 required • FHWA considering joining

  3. Objective Conduct a field evaluation of “enhanced” guide sign font(s) versus the Series E (modified) and Clearview 5WR for use on guide signs Legibility distance will be the measure of effectiveness Nighttime data collection Two test groups (young – 28-54 and older - 55+)

  4. E-Mod-Enhanced E-Mod

  5. Questions?Sue Grothsue.groth@state.mn.us

More Related