160 likes | 306 Views
California Environmental Health Tracking Program Future Assessment Report. CEHTP Technical Meeting Project Briefing 08/22/03. Agenda. Present Project Status Review Interview Responses Review Draft Selection Criteria Highlight Next Steps. Project Status. Conducted 12 of 21 interviews
E N D
California Environmental Health Tracking Program Future Assessment Report CEHTP Technical Meeting Project Briefing 08/22/03
Agenda • Present Project Status • Review Interview Responses • Review Draft Selection Criteria • Highlight Next Steps
Project Status • Conducted 12 of 21 interviews • Highway Performance Monitoring System, Caltrans, Division of Transportation System Information • Medi-Cal Database, DHS, Medi-Cal Statistics Section • SENSOR Asthma Database, DHS, OHB • SENSOR Pesticide Illness Database, DHS, OHB, Agricultural Health and Safety Section • Elevated Lead Visual Information System, DHS, OHB,Occupational Lead Poisoning Prevention Program • Water Quality Monitoring Database, DHS, Drinking Water Program • Aerometric Data Analysis and Management System, CalEPA, ARB • CA Emission Inventory Development and Reporting System, CalEPA, ARB • Pesticide Use Report Database, CalEPA, DPR • Environmental Protection Indicators for California, CalEPA, OEHHA (added) • Patient Discharge Database, OSHPD • National Emission Inventory Database (NEI), USEPA, Emission Factor and Inventory Group
Project Status • Interviews Pending • California Cancer Registry, DHS Cancer Surveillance Section • Birth Defects Database, DHS, Cancer Surveillance Section • AVSS, EDRS or Fetal Deaths, DHS, Office of Health Information and Research, Vital Statistics Section • California Health Interview Survey, UCLA Center for Health Policy Research • Behavioral Risk Factor Survey, Public Health Institute, Survey Research Group • California Women’s Health Survey, Public Health Institute, Survey Research Group • Toxics Release Inventory, USEPA, Toxics Release Inventory Program • Superfund National Priorities List Assessment Program, USEPA • Response and Surveillance System for Childhood Lead Exposure, DHS, Childhood Lead Poisoning Prevention Branch
Interview Objectives For each selected system -- • Understand functionality and technology • Database application, evolution and support • System documentation • System data scope and use • Data collection process • Determine compatibility with EHTN goals • Data collected and period of collection • Age of data repository • Data reliability • Data currency and frequency of update • Data accessibility and confidentiality
Interview Responses (Themes) The Good • Willing network participants • Quality control processes used • Reliable data • Variety of data sharing methods for multiple uses and users • Planned enhancements (continued use) • Limited use/integration of external data • Systems data are accessible electronically
Interview Responses (Themes) The Bad • Range of official and available historical data • Data currency • Limited IT staff resources • Planned enhancements (moving target) • Varying system documentation detail
Interview Responses (Themes) The Ugly • Confidentiality (regulatory vs. non-regulatory mission) • Range and specificity of geographic identifiers • Incomplete data • Period reported (e.g.,annual, monthly, daily) • Organization specific and unique data standards
Draft Selection Criteria • Geographic/spatial specificity (identify event and person location within 1 kilometer) • System documentation (minimum of data dictionary) • Confidentiality (no exclusion of “critical” data) • Data transfer capability (import via electronic transfer) • Data archives (official data archive >5 years) • Data currency (official data available within 6 months from event date)
Draft Selection Criteria • Period reported (minimum of monthly event reporting) • Complete data (estimated receipts >80% of total events) • Reliability (quality control processes used) • Availability of system support (dedicated resources for quality control and system maintenance) • Organization support for system (planning or other documentation demonstrates system support and continuity) • Willingness to participate • Number of records
Next Steps • Complete interviews – September 5, 2003 • Finalize selection criteria – September 5, 2003 • Draft Phase I Briefing Document – September 12, 2003 • Initiate Phase II planning – September 19, 2003