An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 4th Philae Post-Launch Workshop Philae Status and News Venezia; 30st of March 2009

  2. Overview • Philae In-flight Activities • Ground Activities • LCC Funding Situation

  3. Flight Events • In 2008/09 Philae was switched on during 6 operational blocks: • Šteins Rehearsal (Apr 2008) • Active Checkout PC8 (July 2008) • Šteins Flyby (September 2008) • COSAC/CIVA Contingency Slot (November 2008) • Passive Checkout PC9 (January 2009) • Thermal Characterization (February 2009) • Operations Activities successful • Problems / Areas of concern (mostly known problems) • Increased secondary battery discharge • Temperature gradients inside Lander higher than estimated • DPU1 booting problem at low temperatures • ESS converter temperatures • Certain deficiencies in CDMS S/W 6.98 (compared to 7.0) • COSAC HV problems with new SW not understood

  4. Philae In-flight Operations (I) • Šteins Flyby Rehearsal • Test of Solar generator (successful) • Shadowing affects lead to “initial confusion”… • Active Payload Checkout #8 (July 2008) • Maintenance: • New operations: • Upload of CDMS S/W 6.98 • Problems: • CDMS • COSAC • CIVA • APX

  5. Status of CDMS S/W • Version 6.98 successfully uploaded in PC8 • It was recommended by the last LOWG#12 to upload final SW version 8.0 prior to DSH (deep space hibernation) in PC12 • Workshops for SDL and LTS established; inputs to CDMS SW still pending; due end of April(next SDL/LTS meetings 27/28-April 2009) • Several mission critical aspects need to be taken care of • CDMS SW delivery planned for September 2009 • Verification period September to November 2009 • SW Upload in April 2010

  6. Philae In-flight Operations (II) • Šteins Flyby • ROMAP, SESAME and MUPUS operational • ROMAP detects no magnetic signatures due to asteroid • SESAME and MUPUS perform successfully calibration • COSAC/CIVA Contingency Slot (CNT2) • “old” COSAC S/W uploaded • COSAC seems to work nominal (again) with pre-PC#8 SW • COSAC H/W apparently ok • Problem not understood • planned CIVA SW downgrade abandoned • CIVA worked well (no dummy images sent) • Problem during PC#8 not understood

  7. Philae In-flight Operations (III) • Passive Checkout PC#9 • Standard Procedure • Add. APXS measurement • Thermal Characterization (THC2) • Contribution to Lander Thermal Characterization • Calibration measurements for SESAME and MUPUS

  8. Ground Activities • GRM refinement • Open work for ADS: EQM model exchange;FM01 model implementation planned to be finished by May 2009 GRM is used for all Flight ops preparation !! • Development tests for next CDMS S/W v8.0 • Development tests ongoing;SW v8.0 verification period expected for Sep - Nov 2009 • LCC Status • Upgrade of ESA interface (PDOP) ongoing • DAVIS (upgrade development delayed, but continues) • SCrOP, Annex G The document provides an overview on the status of all Philae Cruise Phase requirements • Last version V1.5, 11th of December 2008, distributed to RSOC/RMOC and Lander Team • Lander Software Simulator • upgrade delayed due to priority on CDMS SW v8.0 development, but continues

  9. LCC Funding Situation • New Project plan, based on results of independent review from September 2007 now agreed • Shared LCC funding between DLR Agency and DLR R&D • New staff in the LCC team • Jens Biele (Payload Management) • Ed Trollope (Lander Simulator, Ops preparation (Šteins, Lutetia)) • Christian Krause (RLGS Support) • Koen Geurts (GRM, Ops preparation) • Hans-Herbert Fischer (LCCS support, (SESAME) • Franziska Lenski (QA at MUSC)