An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Cathay Life Insurance (VN) Date: 27 February 2009

  2. Information Technology ENGAGED PROJECT THIS MONTH • Set up data center of The World Center • Set updata center of N’orch Building • Set up data center of Danang Office • Develop the BCS (Business Core System)

  3. Information Technology Set up data center ofThe World Center • Lock USB port of every PC for preventing virus. • Network telephone settings: From Taiwan (dial 929) and N’orch (dial 683)we can call to The World Center directly.

  4. Information Technology Set up data center ofThe World Center (Cont.) • Set up backup Network line for The World Center. • Set up the quality of Network telephone (QoS). • Data center build and relocation: IBM Vietnamprovide us the quotation (include DC build , relocation, and Gen set).

  5. Information Technology Set up data center of N’orch Building • Set up and test the network cable for the training department in N’orch Building. • We store TSMbackup tapes to safe box in data center of The World Center from 3/2/2009. • Get the quotation of Windows Server MA. • Get the agreement of Control-MMA for the 2ed, 3rd and 4th year. • Get the quotation of IBM Middleware MA.

  6. Information Technology Set up data center of N’orch building (Cont.) • IBM VNdoes routine maintenance for our IBM R6 system in 02/2009. • Improve the air conditioner of data center in N’orch Building : Install the voltage stabilizer.

  7. Information Technology Set up data center of Danang Office • We have already installed PCsand printer in the temporary office. • Every equipment for Danang are in Vietnam except the PBX system, and the supplier can install these equipments anytime. • The PBX supplier will provide the temporary system for us, so the opening will be going smoothly.

  8. Information Technology Develop the BCS (Business Core System) • Install the new PIT rule for salary of agency and staff. • Install the function which can download the detail list of working month contract automatically. • Install the uploading of voucher producingand make the user guide. • Install the eScan system in The World Center. • Arrange the training schedule for AP new comer.

  9. Information Technology PLANING PROJECT FOR NEXT MONTH • Maintain BCS and B2E system. • Continue to check the network quality. • Improve the air condition of data center in N’orch Building : Change the new voltage stabilizer. • Continue to set up the system of Danang Building.

  10. Information Technology Thank you.