50 likes | 206 Views
2014 AWA Experiments managed by Jing ---updated on 2/25/2014. Experiment 1: 11.7GHz metallic PE @19MeV DL Experiment 2: 91GHz metallic PE @DL Experiment 3: 12GHz DPETS @WL Experiment 4: Pin cathode BD Study @ BDstand Experiment 5: 26GHz DPETS/TBA @DL.
E N D
2014 AWA Experiments managed by Jing ---updated on 2/25/2014 • Experiment 1: 11.7GHz metallic PE @19MeV DL • Experiment 2: 91GHz metallic PE @DL • Experiment 3: 12GHz DPETS @WL • Experiment 4: Pin cathode BD Study @BDstand • Experiment 5: 26GHz DPETS/TBA @DL
Experiment 1: 11.7GHz metallic PE @19MeV DL Proposed starting date of experiment: 5/1 * This is a high level task assignment. Responsible person manages their own task to meet the deadline. Jing works on each responsible person to regularly get updates.
Experiment 2: 91GHz metallic PE @DL Proposed starting date of experiment: 9/1 * This is a high level task assignment. Responsible person manages their own task, working with secondaries, if needed, to meet the deadline. Jing works on each responsible person to regularly get updates.
Experiment 3: 12GHz DPETS @WL Proposed starting date of experiment: 4/1 * This is a high level task assignment. Responsible person manages their own task, working with secondaries, if needed, to meet the deadline. Jing works on each responsible person to regularly get updates.
Experiment 4: Pin cathode BD Study @BD stand Proposed starting date of experiment: 2/26 * This is a high level task assignment. Responsible person manages their own task, working with secondaries, if needed, to meet the deadline. Jing works on each responsible person to regularly get updates.