1 / 10

Tools of Transformation

Tools of Transformation. SUPPORTS INTENSITY SCALE ™. Our Vision. A system that incorporates the norm-referenced reliability of the SIS into the person-centered practices process developed by the PCP Leadership Team. Supports Intensity Scale ™.

adem
Download Presentation

Tools of Transformation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Tools of Transformation SUPPORTS INTENSITY SCALE™

  2. Our Vision A system that incorporates the norm-referenced reliability of the SIS into the person-centered practices process developed by the PCP Leadership Team

  3. Supports Intensity Scale™ If Person-Centered Practices are the Values that drive our system, then the Supports Intensity Scale™ is the Anchor that will keep them in place

  4. SIS: What is it? • Developed By AAIDD as a standardized assessment that measures the pattern and intensity of supports needed by persons with DD to be successful • The only currently available assessment instrument that measures the frequency and level of support needs rather than deficits

  5. SIS: Multiple Uses • Basis for the Individual Support Plan • Basis for Agencystaffing, staff training, budgeting, strategic planning and evaluation • Basis for resource allocation and Systems planning

  6. SISOnline™ • Web-based; reports generated real-time • Can use laptops to administer • Reports saved in Word/PDF • Data downloaded in XML to CSB databases

  7. Loudoun CSB Region 10 CSB Fairfax CSB Goochland/ Powhatan CSB Piedmont CSB Valley CSB Virginia Beach CSB MP/NN CSB Arlington CSB Cumberland Mountain CSB PW CSB Central Virginia Training Center Wall Residences SIS Pilot Sites

  8. PCP Year 1 * Year 2 * Year 3 * Year 4 * Year 5 * Year 6 * Year 7 * SIS™ Year 1 * Year 4 * Year 7 * The Concept

  9. PCP/SIS Package • Not an add-on to current requirements • Replaces current assessments for Licensure, QMR, and Waivers • Reworks current ISP formats and processes to be person-centered • Exchange of time: more up front to avoid crises later

  10. SIS™ Roll Out • Implementation to start in April, 2009 • Training to follow statewide PCP training schedule • Three year phase-in • Funding available to cover first three years • After three years, anticipate state funding with federal match as a Medicaid Waiver requirement

More Related