1 / 8

Linde Material Handling Division Linde Hydraulics and

Linde Material Handling Division Linde Hydraulics and. Land / Country : Slovenia LHY-Vertretung / LHY-agency : WBA Endkunde / Final customer : EKOP (Rico) , Ribnica. Anwendung / application : Papier- und Abfallpresse / paper press. Technische Daten/datas : Gewicht : to

Download Presentation

Linde Material Handling Division Linde Hydraulics and

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Linde Material Handling DivisionLinde Hydraulics and

  2. Land / Country : SloveniaLHY-Vertretung / LHY-agency : WBA Endkunde / Final customer : EKOP (Rico) , Ribnica Anwendung / application : Papier- und Abfallpresse / paper press • Technische Daten/datas : • Gewicht : to • P-E-Motor : 55 kW • n-Diesel : 1440 Upm LHY-Komponenten / -components : AH / working circuit mit / with 1 x HPR 135-02 RETP PTO with GP PARKER 52 + 8 (AH till 300 bar+Vmin=0 cc-displacement HPR ) LHY-Stücklistennummern / -BOM : 256 000 00 01 LHY-Schalt- und Leitungsplan / -hydraulic schematic :70003012 Projektpotential pro Jahr / expected prodution : 20 Maschinen / 20 units per year Umsatzerwartung pro Jahr / LHY-turnover per year : 50.000 € Projektstatus / status of the project : Start 01-2009 / 1 x Prototype till 12-2009/ HK-messurements 04-2010 Besonderheiten / specialities : Erstes Projekt mit „ETP“-Regler / Elektronikbox = PARKER-Verstärker First ETP-project in Slovenia / ECU from PARKER

  3. Land / Country : CroatiaLHY-Vertretung / LHY-agency : WBA Endkunde / Final customer : HITTNER , Bjelovar Anwendung/Application: Winde Forstmaschine / Skidder whinch „Ecotrac 120V“ • Technische Daten/datas : • Gewicht : to • P-E-Motor : 80 kW • n-Diesel : 2300 Upm LHY-Komponenten / -components : working circuit with 1 x HPV 75-02 LE1 24 P390 420 eB / 1 x HMF 105-02 C PTO with GP PARKER LHY-Stücklistennummern / -BOM : 263 000 00 00 and 294 000 26 00 LHY-Schalt- und Leitungsplan / -hydraulic schematic :PR 9787 + 9788 Projektpotential pro Jahr / expected prodution : 20 Maschinen / 20 units per year Umsatzerwartung pro Jahr / LHY-turnover per year : 50.000 € Projektstatus / status of the project : Start 01-07 / Prototype till 12-07/ HK-messurements 03-08 / Series 08 Besonderheiten / specialities : Former equipment SS / joystick CALDARO included BUCHER Hydraulics-ECU

  4. Land / Country : CroatiaLHY-Vertretung / LHY-agency : WBA Endkunde / Final customer : Dok-ing , Zagreb Anwendung / application : Minenräumer / Mine sweeper „MV 10“ • Technische Daten/datas : • Gewicht : 10,0 to • P-E-Motor : 571 kW • n-Diesel : 2100 Upm LHY-Komponenten / -components : hydrostatic drive with 1 x HPV 105T-02 LE1P / 2 x HMV 105-02 E1 working circuit with 2 x HPV 210-02 LE1P / 4 x HMV 105-02 E1 LHY-Stücklistennummern / -BOM : 264 000 00 00 / 237 000 00 00 / 267 000 00 00 LHY-Schalt- und Leitungsplan / -hydraulic schematic :SP 1900057 Projektpotential pro Jahr / expected prodution : 10 Maschinen / 10 units per year Umsatzerwartung pro Jahr / LHY-turnover per year : 200.000 € Projektstatus / status of the project : Start 07 / Pre-Series 2008 Besonderheiten / specialities : WBA-responsibilty / O&K final drives F20 / F50 / Stiebel-splitter gear box / Dok-ing ECU  Option : E-Drive

  5. Land / Country : SerbiaLHY-Vertretung / LHY-agency : WBA Endkunde / Final customer : GOSHA Anwendung / application : Power Packs for industrial gates • Technische Daten/datas • Gewicht : to • P-E-Motor : 55 / 110 kW • n-Diesel : 1450 Upm LHY-Komponenten / -components : working circuit with 1 x HPR 105/135/165/210(T)-02 RE1L/RLP/RETP+SPU LHY-Stücklistennummern / -BOM : 254 / 255 / 256 / 257 000 00 00 (01) LHY-Schalt- und Leitungsplan / -hydraulic schematic : Projektpotential pro Jahr / expected prodution : 25-50 Maschinen / 25-50 units per year Umsatzerwartung pro Jahr / LHY-turnover per year : 40.000-80.000 € Projektstatus / status of the project : Start 07 / Series 08+09 Besonderheiten / specialities : WBA-responsibilty / PPT-Engineering Technical support / HYMA or MOTRAC Hydrauliek - production

  6. Land / Country : SerbiaLHY-Vertretung / LHY-agency : WBA Endkunde / Final customer : PPT Eng. , Belgrad Anwendung / application : Hydraulikaggregate / Power Packs for off shore • Technische Daten/datas • Gewicht : to • P-E-Motor : 22 kW • n-Diesel : 740 / 970 Upm LHY-Komponenten / -components : working circuit with 4 x HPR 55-02 RLPP LHY-Stücklistennummern / -BOM : 252 000 00 00 LHY-Schalt- und Leitungsplan / -hydraulic schematic : Projektpotential pro Jahr / expected prodution : 10 Maschinen / 10 units per year Umsatzerwartung pro Jahr / LHY-turnover per year : 60.000 € Projektstatus / status of the project : Start 2008/09 Besonderheiten / specialities : PPT-Engineering – Know How

  7. Land / Country : SerbiaLHY-Vertretung / LHY-agency : WBA Endkunde / Final customer : PPT Eng. , Belgrad application : Hydraulikaggregate / Power Packs for river gates „Wolga-Don“ • Technische Daten/datas : • Gewicht : to • P-E-Motor : kW • n-Diesel : Upm LHY-Komponenten / -components : working circuit with HPR 210-02 RETP or HPV 210-02 RE1 LHY-Stücklistennummern / -BOM : 257 000 00 00 LHY-Schalt- und Leitungsplan / -hydraulic schematic : Projektpotential pro Jahr / expected prodution : 13 Tore @ 8 Aggregate / 13 Gates @ 8 power packs Umsatzerwartung pro Jahr / LHY-turnover per year : 250.000 € Projektstatus / status of the project : Start 2008/09 / on hold (discussion with Russian government) Besonderheiten / specialities : PPT-Engineering – Know How

  8. Thank you for the attention .

More Related