1 / 3

Run1 reprocessing and Calibration activities

Run1 reprocessing and Calibration activities. Kai Schweda , GSI and Chiara Zampolli , U. Bologna and INFN 25-June-2014. Run1 Reprocessing. LHC11a Cpass0, 135 runs with beam, 101 good runs Of these, 80 runs with either TPC, TRD, TOF, T0, SDD, SPD

aderes
Download Presentation

Run1 reprocessing and Calibration activities

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Run1 reprocessing and Calibration activities Kai Schweda, GSI and Chiara Zampolli, U. Bologna and INFN25-June-2014

  2. Run1 Reprocessing • LHC11a • Cpass0, 135 runs with beam, 101 good runs • Of these, 80 runs with either TPC, TRD, TOF, T0, SDD, SPD • 68 ok, 11 failed in EV, 1 in TOF (no tracks selected) • 12 failed runs are 146105 146148 146208 146369 146374 146376 146390 146393 146394 146400 146401 146402 • 146105: failed in TOF (statistics), no crash, under investigation • 146148, 146208: in EV due to TPC, TMinuitfitting problem (FitSlicesY), needs fix in several places, then benchmarking; work in progress. • Remaining 9 runs failed, WITHOUT magnetic field due to TPC, histograms empty, division by zero  protection put in place • With new release of Alirootshould then be fine, to be checked

  3. Run2 Offline Calibration • When CPass1 finished, manual intervention necessary to recover failed runs (due to statistics – e.g. TRD);time consuming, depends on availability of people • Add a process after standard CPass0/1 that “fills the holes” automatically • Allow CPass0/1 jobs to wait before being closed till the previous runs are finished; when one is done, copy automatically OCDB entry • Could still introduce delay, but only for runs suffering from low statistics • Lightweight Production Manager (LPM) can handle complex dependencies of runs (e.g. good, bad, bad, good, bad, bad ) • Discussions ongoing with detectors and offline, define specific use cases and make proposal

More Related