100 likes | 271 Views
WORKING GROUP ON HYDROLOGY RA - V. E ight Issues as Regional Priority Needs for Hydrology and W ater Resources: Education , training and capacity building ; HYCOS projects; Adaptation to climate change in water sector; Water quality monitoring and assessment ;
E N D
Eight Issues as Regional Priority Needs for Hydrology and Water Resources: Education, training and capacity building; HYCOS projects; Adaptation to climate change in water sector; Water quality monitoring and assessment; Sustainable maintenance and calibration of equipment for hydrology and water resources; Flood forecasting; Exchanging and sharing of hydrological data and information and Quality management Framework (QMF).
Working Group on Hydrological Services (WG-HYS) • Lead of Working Group on Hydrological Services • Dr.Arie S. Moerwanto (Indonesia) • Theme Leader • in WHYCOS • Theme Leader in QMF-HYDROLOGY Dr.Arie S. Moerwanto (Indonesia) Mr. John Fenwick (New Zealand)) • Theme Leader in Water Quality Assessment • Theme Leader in Hydrological Forecasting and Drought Predication • Theme Leader in Climate Change Impact on the Water Sector Mr.SulumaloAmatagaPenaia (Samoa) Mr.Adnan bin AbLatif (Malaysia) Dr. Wan Hassan Wan Azil (Malaysia)
Possible Activities 2012 : • Provide Training related to flash floods by involving COMET • Provide Workshop on Utilization of satellite data for flood forecasting and drought prediction by involving Deltares (Netherland) or ICHARM (Japan) • Provide training in compiling and implementing basic quality management plans to achieve continual performance improvements and incorporating the relevant ISO standards (proposed by John Fenwick) • * Meeting on Sea Hycos Project development • * Meeting on proposals to strengthen the outputs from Pacific Hycos(proposed by John Fenwick)