1 / 26

V8H Intro

V8H Intro. V8 was re-rated Higher AFUE’s Boxed Burners on skid Return piping & circ. Shipped in box. Everything in one box Left or right header Standard or dropped header Factory-spec piping with little or no cutting!. MegaSteam Near Boiler Piping Kits. Larger Tappings on AL119SL.

adila
Download Presentation

V8H Intro

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. V8H Intro • V8 was re-rated • Higher AFUE’s • Boxed Burners on skid • Return piping & circ. Shipped in box

  2. Everything in one box Left or right header Standard or dropped header Factory-spec piping with little or no cutting! MegaSteam Near Boiler Piping Kits

  3. Larger Tappings on AL119SL Hot out & Cold in tapings were enlarged to 1 ½” Lowers velocity of water entering & exiting the tank Coil in/out tapings remain 1” T&P, drain, and well tapings remain ¾”

  4. Stainless Tee’s for MPO DV • Stainless tee’s reduce footprint of DV units • Vent pipe does not need to make a 90° • Made of 304 Stainless • Clears return piping • Features cleanout on bottom

  5. MPO 115 • 115Mbh (.8gpm) model now available! • 2-section boiler • Different burner spec’s • Different flue baffles • 85Mbh Net IBR Rating • Riello Burner option

  6. Riello Burner Options for MPO • All MPO chimney vent models can be ordered w/ Riello F5’s • Burners use electric air dampers • BF burners coming soon for MPO-DV models!

  7. PVG/SCG Crate Improvements • Skids are now built on hardwood 2” x 4” ’s • Improvements based on test units shipped to CO and back. • Stronger base should resist shipping & handling damage

  8. Short-Term Projects

  9. V8H Burner Consolidation • All Water & Steam burners have been consolidated • Part #’s are simplified • Burners will ship with low rate nozzle installed • High rate nozzle will ship in box

  10. Burner Consolidation • Blue steel cover removed from standard build • Burner cover will be optional • Optional cover is now black molded plastic • New fresh air kit for cover • New armored power cable Pic of burner w/new cover and cord

  11. Riello Combo Burners for V8H • Combo burners return to V8H line • F5 combo covers V8H3-V8H5 • V8H6 is unique • F10 combo covers V8H7-V8H9

  12. V8H Burner in a Box

  13. V8H “Burner in a Box” • All boilers built “Less Burner” • Existing product codes will be used • Burners will have separate part #’s • Existing burners in inventory will work! Existing order code: PV8H3WC-TBWN New order code: PV8H3WC-TLWN Part # (Beckett AFG for V8H3)

  14. V8H “Burner in a Box” • Boiler is shipped in existing packaging – for now • Boiler includes circulator, return piping & trim • Burner is shipped in factory packaging Pic of V8H BIB on skid

  15. V8H “BIB” Labeling • Labels will have bold marking indicating “Less Burner” • Tell your wholesalers what to look for • Changeover will occur on 9/1.

  16. AFG Cover & Fresh Air Kit

  17. Riello Burners • Universal burners return • Simplifies inventory and ordering

  18. MPO Boiler Burner in a box

  19. MPO “Burner in a Box” • All MPO’s will be shipped “Less Burner” • Beckett, Riello, & Carlin burners will be available • Burner will be separate line item on order • Existing codes will be used Example: MPO147-TL

  20. MPO Direct Vent Kit • DV kit can be added to any MPO boiler • No need to order separate MPODV model • DV will be available with Beckett NX or Riello BF burners! • Changes due 9/1 Pics of MPO BIB, DV kit, burner box, & flex pipe

  21. MST Burner in a box

  22. Megasteam “Burner in a Box” • MST will also be configured with “Burner in a Box” • Will offer Beckett, Riello, & Carlin burner options • Will use existing skid with clear markings

  23. Larger inputs on MPO & MST • 6 & 7 section boilers are being tested • Larger units will round out model line • Split block options for field assembly may be an option

  24. Questions???

More Related