260 likes | 444 Views
V8H Intro. V8 was re-rated Higher AFUE’s Boxed Burners on skid Return piping & circ. Shipped in box. Everything in one box Left or right header Standard or dropped header Factory-spec piping with little or no cutting!. MegaSteam Near Boiler Piping Kits. Larger Tappings on AL119SL.
E N D
V8H Intro • V8 was re-rated • Higher AFUE’s • Boxed Burners on skid • Return piping & circ. Shipped in box
Everything in one box Left or right header Standard or dropped header Factory-spec piping with little or no cutting! MegaSteam Near Boiler Piping Kits
Larger Tappings on AL119SL Hot out & Cold in tapings were enlarged to 1 ½” Lowers velocity of water entering & exiting the tank Coil in/out tapings remain 1” T&P, drain, and well tapings remain ¾”
Stainless Tee’s for MPO DV • Stainless tee’s reduce footprint of DV units • Vent pipe does not need to make a 90° • Made of 304 Stainless • Clears return piping • Features cleanout on bottom
MPO 115 • 115Mbh (.8gpm) model now available! • 2-section boiler • Different burner spec’s • Different flue baffles • 85Mbh Net IBR Rating • Riello Burner option
Riello Burner Options for MPO • All MPO chimney vent models can be ordered w/ Riello F5’s • Burners use electric air dampers • BF burners coming soon for MPO-DV models!
PVG/SCG Crate Improvements • Skids are now built on hardwood 2” x 4” ’s • Improvements based on test units shipped to CO and back. • Stronger base should resist shipping & handling damage
V8H Burner Consolidation • All Water & Steam burners have been consolidated • Part #’s are simplified • Burners will ship with low rate nozzle installed • High rate nozzle will ship in box
Burner Consolidation • Blue steel cover removed from standard build • Burner cover will be optional • Optional cover is now black molded plastic • New fresh air kit for cover • New armored power cable Pic of burner w/new cover and cord
Riello Combo Burners for V8H • Combo burners return to V8H line • F5 combo covers V8H3-V8H5 • V8H6 is unique • F10 combo covers V8H7-V8H9
V8H “Burner in a Box” • All boilers built “Less Burner” • Existing product codes will be used • Burners will have separate part #’s • Existing burners in inventory will work! Existing order code: PV8H3WC-TBWN New order code: PV8H3WC-TLWN Part # (Beckett AFG for V8H3)
V8H “Burner in a Box” • Boiler is shipped in existing packaging – for now • Boiler includes circulator, return piping & trim • Burner is shipped in factory packaging Pic of V8H BIB on skid
V8H “BIB” Labeling • Labels will have bold marking indicating “Less Burner” • Tell your wholesalers what to look for • Changeover will occur on 9/1.
Riello Burners • Universal burners return • Simplifies inventory and ordering
MPO “Burner in a Box” • All MPO’s will be shipped “Less Burner” • Beckett, Riello, & Carlin burners will be available • Burner will be separate line item on order • Existing codes will be used Example: MPO147-TL
MPO Direct Vent Kit • DV kit can be added to any MPO boiler • No need to order separate MPODV model • DV will be available with Beckett NX or Riello BF burners! • Changes due 9/1 Pics of MPO BIB, DV kit, burner box, & flex pipe
Megasteam “Burner in a Box” • MST will also be configured with “Burner in a Box” • Will offer Beckett, Riello, & Carlin burner options • Will use existing skid with clear markings
Larger inputs on MPO & MST • 6 & 7 section boilers are being tested • Larger units will round out model line • Split block options for field assembly may be an option