An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Cutting the Green IT Hype: Fact vs. Fiction Kenneth G. Brill, Executive Director Uptime Institute Inc kgb@uptimeinstitute.org

  2. Agenda • What constitutes green IT? • Innovative facilities ideas • Direct current versus alternating current • Water cooling versus air cooling • Free cooling: Water versus air • What is the business mission of IT? • What constitutes green IT hype?

  3. What Is Green IT? • Energy and materials consumed in fabrication • Products (paper, hardware, components) • Data center building and site infrastructure • Waste stream disposal • Energy source sustainability • Compute energy consumption • Desktop and laptop (“beyond the data center”) • Servers, storage, network (data center) • Site infrastructure energy overhead • Power + cooling

  4. Data Center Energy Dashboard“As Found” As Found Waste Site Infrastructure Overhead Best Practice Efficiency Data Center Energy Overhead Energy Losses Waste Hardware Overhead Best Practice IT Hardware “Plug” Load Idle Compute Productive Output Active

  5. Data Center Energy Dashboard After a “Green Tune-up” • Increased IT asset utilization • Increased energy efficiency per IT watt • Increased use of IT and Facility Best Practices Site Infrastructure Overhead Best Practice Efficiency Data Center Energy Overhead Energy Losses Hardware Overhead Best Practice IT Hardware “Plug” Load Idle Compute Productive Output Active

  6. Data Center Sustainability Is Determined By Zip Code • Renewable energy sources (lowest GHG) • Wind, solar, tide (each is interruptible, space/land intensive and can not be used for base load) • Geothermal, hydro (mostly continuous) • Non-renewable energy sources (lowest to highest GHG) • Nuclear, natural gas, oil, coal • Free-cooling: number of days depends on: • Zip code • Computer room temperature and relative humidity • Beware: Higher temperatures do not necessarily save energy

  7. “LEEDs” For Data CentersLeadership In Energy Efficient Design • California Energy Commission is sponsoring development of Environmental Performance Criteria for data centers • Shifts the awarding of potential points toward energy efficiency and away from bike racks • Protocol voting this fall • Current U.S. Green Buildings Council LEED ratings are meaningless for data centers • Energy consumption 20-40x office buildings • Few people relative to building size • Outside air and windows are not necessarily good solutions for computer room cooling

  8. Two Locations For Measuring Site Infrastructure Energy Performance • At the data center utility meter (must include all forms of energy: electric, chilled water, steam, diesel, one-pass cooling) • At the IT hardware plug (however, UPS output is easiest to measure and in most cases is much more accurate)

  9. Power Utility UPS Powered Cooling Unit Fans Battery UPSPowered Critical Pumps UPS IN PDU OUT Primary Switchgear Chillers Computer Equipment Critical Load CoolingTowers Pumps Engine Generator Plant CoolingUnits Misc. Loads Site Infrastructure Energy FlowEnergy Overhead = IN ÷ OUT

  10. Site Infrastructure Energy Overhead • Ratio of energy into the data center versus what is delivered to IT hardware • Overhead performance will depend upon: • Zip code (weather and season) • Equipment installed • Site asset utilization • Site infrastructure Tier level • Implementation of best practices • Green Grid calls this number PUE (under revision), but has resulted in many misleading marketing claims and growing industry confusion

  11. Data Center Energy Sources • Electricity • Natural gas • Diesel fuel • Free cooling • Other (steam, chilled water, one-pass cooling)

  12. Energy Versus Power • Energy is power over time • Recommend using a 12 month moving average • Peak power determines required sizing of component capacity

  13. Site Infrastructure Energy Overhead • Uncontrollable “as-built” factors affecting SIEO • Greenness of site energy sources • Site infrastructure design and component selection • Tier level and uninterruptible cooling • Weather and seasonal variation • Controllable factors affecting SIEO • Increasing IT load as percent of site capacity • Cooling system optimization • Utilizing free-cooling capabilities • Implementation of best practices -- mainly cooling

  14. Site Infrastructure Energy Overhead Typical Improvements • Measure Site Infrastructure Energy Overhead • Correctly implement cold/hot aisle (28 steps) • Bypass airflow <10% (seal cable cutouts, install blanking plates, perf tile qty and location)

  15. Site Infrastructure Energy Overhead Typical Improvements • Right size cooling • Repair degraded cooling units • Correct cooling unit setpoints (eliminate dueling cooling units) • Increase computer room IT intake temperature -- 77°F • Turn off unneeded cooling • Increase chilled water temperature • Appropriately utilize free cooling • Increase site capacity utilization

  16. AC Vs. DC Power Flow Power Utility UPS Powered Cooling Unit Fans Battery UPSPowered Critical Pumps UPS PDU Primary Switchgear Chillers Computer Equipment Critical Load CoolingTowers Pumps Engine Generator Plant CoolingUnits Misc. Loads

  17. DC Power Improves Both Hardware And Site Infra. Overhead Efficiency As Found Waste Site Infrastructure Overhead Best Practice Efficiency Data Center Energy Overhead Energy Losses Waste Hardware Overhead Best Practice IT Hardware “Plug” Load Idle Compute Productive Output Active

  18. Direct Current Things To Consider • IT Hardware • Availability of hardware over life of site infrastructure • Premium for hardware with DC input (5x to 8x product replacement vs. site infrastructure life • Point of use DC vs. Data Center DC • Voltage choices: 48 VDC vs. 750 VDC • Code, fault protection and skills

  19. Cooling • Water vs. air for cooling • Water is 3,400 times more efficient • Water to hardware (mainframe cooling) • Water to back door or ceiling units (load neutralization)

  20. Simplified Computer Room Heat Movement

  21. Computer Product Environmental Limits

  22. High Density Cooling Solutions (continued) Liebert’s Vertical Top Cooler Supplemental System (up to 8 kWC per unit)

  23. Free-Cooling Choices • “Open the windows” vs. Air Side or Water Side Economizers • Open vs. closed environment • Relative humidity vs. reliability • Energy cost of maintaining relative humidity in an open environment • Particulates and contamination • Impact of neighbors (fire, dust, contaminants) • Open is an OpEx play only (i.e., must still have cooling CapEx for some portion of year)

  24. Heat Movement Holistic View

  25. Air-Cooled Condenser Or Dry Cooler Components include: • Refrigerant or glycol coils reject heat to the atmosphere • Fans • Heat rejection capacity drops significantly on hot days

  26. Cooling Tower -- Induced Draft Type Components include: • Tower and fill • Fan • Basin to catch cooled condenser water • Rejects most heat through water evaporation • Fan rotation can be reversed for deicing

  27. Cooling Tower -- Forced Draft Type Components include: • Tower and fill • Fan • Basin to catch to cooled condenser water • Rejects most heat through water evaporation • Less appropriate for freezing climates

  28. What Is The Mission Of IT? • Business value vs. energy efficiency • What will you get promoted/fired for? • Saving energy? • Causing downtime?

  29. What Constitutes Green IT Hype?Reality Vs. Risk/Reward Balance • Energy and materials consumed in fabrication • Products (paper, hardware, components) • Data center building and site infrastructure • Waste stream disposal • Energy source sustainability • Compute energy consumption • Desktop and laptop • Servers, storage, network • Site infrastructure energy overhead • Direct Current • Water vs. air cooling • Free-cooling