10 likes | 118 Views
Floor Grid Pre-fabricate –M fittings. Responsible: Helms/Johnson Approved by: S. Przybelinski Date: 8/1/2012. GTG: . Y. G. Is / Was. Description: Floor Grid has a gap issue that is causing –M parts to be order every AP Ordering 3-4 –M parts per AP and AP 60 saw 10 –M parts
E N D
Floor Grid Pre-fabricate –M fittings Responsible: Helms/Johnson Approved by: S. Przybelinski Date: 8/1/2012 GTG: Y G Is / Was • Description: • Floor Grid has a gap issue that is causing –M parts to be order every AP • Ordering 3-4 –M parts per AP and AP 60 saw 10 –M parts • Ordering Special Ti Fitting and Special Bushes, as the dimension is different each AP and each part is link to a EPD that calls out the unique dimensions • Closure Criteria: • Part(s) defined (Complete 3/26) • Parts on dock Applicability: -9 -10 -8 Line no. Target : 90 Status: Reasons: Perform. Cost Maint. Produce. Rate Supplier / Partner Focal: N. Norman/K. Helms Originating Organization: ME Anticipated Benefits: Customer:________Program__ Weight reduction:______N/A__ Labor hrs reduction:____TBD_ Cr path reduction:_____12 hr__ BOEING PROPRIETARY ECCN 9E991