Larry O. Daniel Prototype Integration Facility

Larry O. Daniel Prototype Integration Facility A Government Owned and Government Operated Organization Established in July 2002. Larry O. Daniel Prototype Integration Facility . In 2008 the name PIF was adopted throughout RDECOM. . Prototype Integration Facility.

adolfo
Download Presentation

Larry O. Daniel Prototype Integration Facility

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Larry O. Daniel Prototype Integration Facility A Government Owned and Government Operated Organization Established in July 2002 Larry O. Daniel Prototype Integration Facility In 2008 the name PIF was adopted throughout RDECOM.

  2. Prototype Integration Facility Premier Provider of Rapid Response and Integrated Hardware Solutions • A Government Owned and Government Operated (GOGO) contractor supported Enterprise established to meet the most compelling and urgent needs of the U.S. Government and our allies • PIF Products rapidly fielded directly to the warfighter • PIF products save lives • Unique Streamlined Processes developed from Lessons Learned and Best Government and Industry Practices • Collocation of all People in the Value Stream • PIF productscover a very broad range of requirements • Unforecasted warfighter requirements daily • Very rapid response required • Innovation with a sense of urgency • Proven 10 Year History of Success • Unique teams for each project • 300+ Subcontractors • 2000 material vendors ISO9001:2008 Registered “This is a technology hub for our Army, and I have been impressed with Redstone Arsenal, especially in an area called the PIF.” GEN George W Casey Jr. US Army Chief of Staff

  3. Broad Mission WARFIGHTER FOCUSED RAPID RESPONSE APPROACH Naval Autonomous Underwater Vehicle Fabricating piece parts within 2 weeks RECCE Vehicle Fully integrated system in 120 days 2007 Top Ten Greatest Inventions Blue Force Tracker 4000 fielded, 150 Configurations Less than 5 yrs 2004 Top Ten Greatest Inventions FIDO/PackBot Remote Explosive Detector Initiation to field in 90 days 2006 RDA Award Winner 2006 Top Ten Greatest Inventions GMD Rocket Restraint Enabled Largest Rocket test in DOD history, 6 months Jet Ranger 5 Aircraft for Iraqi Air Force, 10 months Crew Extraction Brackets 800 fielded in 2 weeks 2006 Top Ten Greatest Inventions SLAMRAAM on HIMARS DEMO Concept to Test – 8 Months ASPI Design to Fielding Less than 1 year UAV CRS - Communication Relay System Developed &fielded in 1 year 2007 RDA Award Winner 2007 Top Ten Greatest Inventions Tandem HUSKY Provided improved capabilities for route clearance teams 2010 Top Ten Greatest Inventions Aviation M4 Gun Mounts 2322 sets fielded, 6 configurations WIDE RANGE of INNOVATION with a sense of URGENCY

  4. One-Stop-Shop Capabilities • Operations Support • Quality Assurance • Production Planning and Control • Inventory Control • Purchasing • Program Management • Govt to Govt Interface • Acquisition Corp Members • Experienced TS/SCI PM Team • On-Site Budget Office • On-Site Contracting Officers • Integration • Ground Platforms • Aviation Platforms • GGFR Assigned for Ground Operations • GFR Assigned for Flight Operations • Engineering • Design and Analysis • Circuit Card Design/Layout • Simulation, Analysis and Modeling • Visualization Based Design • Test and Documentation • Obsolescence Management • Test • On-Site Airworthiness Coordination • ATEC Test Coordination • Fabrication • Machining and Sheet Metal • Cable/Wiring Harness Assembly • Circuit Assembly and test • Circuit Board Fabrication and Plating • Electrical and Mechanical Assembly • Documentation • Technical Data Packages • Technical Manuals • Maintenance Work Orders • Acquisition Packages for Future Acquisitions RAPIDLY INTEGRATE Core Competencies with other Government and Industry Expertise to get the RIGHT TEAM for EACH PROJECT

  5. GOGO Project Execution GOGO Project Execution Best Value Selection of Subs and Material Vendors PIF Gov PM Team Creates SOW for Contract Teaming Required w/Subs PIF Gov Team Defines Execution Strategy Prime Contractor Determines Execution Strategy Prime Develops SOW(s) for Subs PIF Gov PM Team Defines Requirements with Customer Internal Internal Dedicate internal staff or develop teaming arrangements Prime Requests Proposals from Subs Procure Materials Dedicate internal staff or develop teaming arrangements Procure Materials LEGEND Sub(s) Draft Proposal(s) Government Action Prime Contractor Action Sub-Contractor(s) Action • Right team rapidly responding to the Warfighter • Different teams assembled for each task • Automated tool for contracted activity Project is Executed through TEAMING

  6. Teaming Flexibility AH-64 ASPI RECCE (JIEDDO) PM Design Materials Facilities Fabrication Integration PM Design Materials Facilities Fabrication Integration FidoPackbot COMM Relay PM Design Materials Facilities Fabrication Integration PM Design Materials Facilities Fabrication Integration A2C2S Government Prime Contractor - RDS Subcontractors PM Design Materials Facilities Fabrication Integration PIF projects require flexible and rapid teaming

  7. Industry Days • December 4-6, 2013, Redstone Defense Systems will be hosting an Industry Days for the PIF at 631 Discovery Dr., Huntsville, AL • Industry is invited to brief their capabilities &/or resources for consideration on future tasks • POCs: Jeanette Watson, (256) 313-5155, jeanette.watson@us.army.mil Julio C. Driggs, (256) 876-2275, julio.c.driggs@us.army.mil Teamwork

  8. Summary • PIF provides rapid development and fielding of hardware directly to the warfighter • PIF products save lives, delays cost lives • PIF products cover a very broad range of requirements • No two projects are alike • Unforecasted customer requirements • Wide range of customers and needs • PIF effectiveness and rapid response enabled by: • Flexible contract vehicle allowing rapid contract action and subcontracting w/o limitation of companies used • Core PIF team augmented by government network and subcontracted SMEs as required Engineering Computer Aided Design Manufacturing Integration & Fielding

More Related