TPC INTEGRATION & SERVICES. Participants: S. Evrard/EST D. Gabriele /EST R. Gregory/EST F. Hahn /EP S. Haider /EP S. Maridor/EST Meuller /ST L. Leistam/EST M. Pimenta dos Santos /ST P. Szymanski/EP. Mini Space Frame Back Frame Cooling Systems Cables Gas Systems
E N D
TPC INTEGRATION & SERVICES Participants: S. Evrard/EST D. Gabriele /EST R. Gregory/EST F. Hahn /EP S. Haider /EP S. Maridor/EST Meuller /ST L. Leistam/EST M. Pimenta dos Santos /ST P. Szymanski/EP Mini Space Frame Back Frame Cooling Systems Cables Gas Systems Items Requiring Urgent Attention TPC Collaboration Meeting
MINI SPACE FRAME Original concept Access Now more detail TPC Collaboration Meeting
BACK FRAME General Layout Access ROC Installation tool TPC Collaboration Meeting
COOLING Work package & Units Detailed design Installation schedule Cost estimates TPC Collaboration Meeting
CABLES Low Voltage High Voltage Control & Read-out TPC Collaboration Meeting
CABLES (LV) TPC Collaboration Meeting
CABLES (LV) Cont. * 40m length TPC Collaboration Meeting
CABLES (LV) Cont. Companies recommend Cables outside L3 magnet & Bus Bars inside (economic reasons) Heat dissipation from Bus Bars a worry (cooling will be necessary) TPC Collaboration Meeting
TEMPERATURE (0.18) TPC Collaboration Meeting Anna Mueller ST/CV
VELOCITY FIELD (0.18) TPC Collaboration Meeting Anna Mueller ST/CV
TEMPERATURE (0.24) TPC Collaboration Meeting Anna Mueller ST/CV
CABLES (HV) 100kV on both RB24 & RB26 sides HV (FEE ?) both sides Control cables for HV both sides TPC Collaboration Meeting
CABLES (control) DDL Cal. Pulser Gating Pulser Temperature sensors Clock/Trigger DCS/Profibus Other? TPC Collaboration Meeting
GAS STSTEMS Work packages Limits of supply Construction of units has commenced Testing with dummy load May 2003 TPC Collaboration Meeting
WORK PACKAGES Mixing,circulation,purifier & CO2 separation units (GWG) Primary supplies & interconnecting pipework (EST/GDS) Integration (ALICE Team) GOOFI unit (???) TPC Collaboration Meeting
LIMITS of SUPPLY Up to a flange on the distribution manifold (front face of the TPC Field Cage) Flange Flexible Field cage Pipe from GOOFI unit Manifold Limit of supply TPC Collaboration Meeting
SYSTEM TESTS Starting Spring 2003 In SGX2 With 90m3 dummy load Is it required to test TPC before lowering to UX25? If so where? TPC Collaboration Meeting
ITEMS REQUIRING URGENT ATTENTION LV Cable Cooling ROC Insertion Tool TPC Collaboration Meeting