Earthwork & Volumes. Spec Requirements End Areas End-area Volumes Borrow Pit Volumes Mass Diagrams Cost Estimates. Earthwork Specs. Payment based on excavation (Cut) Specs define methods for cut and fill Typically not paid for fill

adonica
Download Presentation

Earthwork & Volumes

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Earthwork & Volumes • Spec Requirements • End Areas • End-area Volumes • Borrow Pit Volumes • Mass Diagrams • Cost Estimates

  2. Earthwork Specs • Payment based on excavation (Cut) • Specs define methods for cut and fill • Typically not paid for fill • Based on “Excavation measured in place as computed from survey notes” • Not weighing, counting truck rounds • Look for spec allowing contractor to dispute volumes in a certain area

  3. Excavation Specs • Common excavation • Determined from survey notes • Describes most of work • Rock/Muck • Rock requires blasting • Muck requires deep dig, granular fill • Before/after volume survey

  4. Haul Payments • Volume payments - $/cy Excavation • Separate lines for common, rock , muck • Free Haul - Stations • Overhaul - $/cy-stations • Borrow - $/cy • Covers cost of lease, haul, reclamation • Waste - $/cy

  5. L C End Areas • Based on • Cross-sections • Typical section • Area – ft2 • Cut • Fill

  6. Construction Grade Staking • Based on “typical section” • Stake centerline, slope “breakouts”

  7. 12’ + 4’(4) + 8’ + 6.3’(4) = 61.2’ Slope Stakes

  8. 12’ + 3.7’(4) = 26.8’ Slope Staking

  9. End Area Calculations

  10. 3-level Sections • Triangular Sections • 5-level Sections • Other Sections End Area Calculations • Level Sections

  11. Level Sections

  12. 3-Level Sections

  13. 5-Level Sections

  14. Transition Sections

  15. End Area Calculations • Planimeter • Coordinate Calculations • Similar to coordinate area • Start/end at same point

  16. Assign (0, 0) Coordinate Areas 30 ‘ top, left shoulder (-15, 0)

  17. Coordinate Calc Example

  18. End-Area Volumes AI = 390.6 ft2 AH = 338.3 ft2 AG = 144.8 ft2 AE = 15.6 ft2 AE = 15.0 ft2 AD = 113.2 ft2 AB = 258.2 ft2 AA = 338.2 ft2