MBCx Projects – Programs, Process, and Results Soda, Tan, Shields and Wurster

MBCx Projects – Programs, Process, and Results Soda, Tan, Shields and Wurster. David Jump, Ph.D., P.E., Matt Denny, P.E. Quantum Energy Services & Technologies, Inc. Arch 249X: The Secret Life of Buildings, Oct. 2008. Overview. This presentation will discuss:

adsila
Download Presentation

MBCx Projects – Programs, Process, and Results Soda, Tan, Shields and Wurster

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MBCx Projects – Programs, Process, and Results Soda, Tan, Shields and Wurster David Jump, Ph.D., P.E., Matt Denny, P.E. Quantum Energy Services & Technologies, Inc. Arch 249X: The Secret Life of Buildings, Oct. 2008

  2. Overview This presentation will discuss: • Process and Benefits of Monitoring-Based Commissioning • Differences with RCx • Integration of M&V in RCx • Results from 3 Buildings • Progress on Wurster • Discussion

  3. Monitoring-Based Commissioning (MBCx) • Third-Party Energy Efficiency Partnership Program • Funded by public goods charges under auspices of CPUC • Available to University of California and California State University Campuses • One of multiple RCx programs in California: • PG&E Core RCx Program • PG&E RCx Services and Incentives Program • SCE RCx Program • SCE/LA County RCx Partnership (LA County buildings only) • San Diego RCx Program

  4. MBCx Project Scope RCx Process Additional MBCx Elements • Planning Phase • Develop M&V Plan (IPMVP or ASHRAE 14) • Add energy metering • electric interval, gas pulse, steam, etc. • systems level (e.g. chillers, AHU, etc.) • Planning Phase • Initial site visit • Review documentation • Identify project requirements • Provide commissioning plan • Investigation Phase • Inventory equipment • Calibrate sensors, conduct PM activities • Develop and carry out functional tests • Identify operational deficiencies • Document costs and benefits to correct deficiencies • Implementation Phase • Install and commission measures • Document improved performance • Hand-off Phase • Provide final report • Provide training • Investigation Phase • Begin monitoring • Energy • Independent variables (OAT, etc.) • Develop Baseline energy model • Implementation Phase • Collect post-installation data • Develop post-installation model • Determine Savings • Hand-off Phase • Establish energy tracking system • Provide periodic savings reports • Address deficient performance

  5. Approach • Select measurement boundary • Option C - Whole Building • Option B: Retrofit Isolation (HVAC Systems)

  6. Approach • Defining Systems - by ‘Services’ provided • Chilled water system: • Chiller, CHW pumps, etc. • Air handling system: • Supply fan, return fan, exhaust fan • Hot water system: • Boiler, HW pumps

  7. Three Case Studies • UC Berkeley • Soda Hall – Computer Science Building, 109,000 ft2 • Tan Hall – Chemistry Building (100% OA), 106,000 ft2 • UC Davis • Shields Library – main undergraduate library, 400,070 ft2

  8. Soda Hall • UC Berkeley’s Computer Science Department (24/7 operation) • 109,000 ft2 • Central Plant (2 - 215 ton chillers & associated equipment) • Steam to hot water heating • 3 Main VAV AHUs, • AHU1 serves building core, • AHUs 3 and 4 serve the perimeter, with hot water reheat

  9. Soda Hall RCx Findings

  10. M&V Approach for Soda Hall • Assessment: • Whole-building electric and steam meters present • EMS that trends all points at 1 min (COV) intervals • 8-month history of data • RCx measures in AHU and Chilled Water Systems • Electric and steam savings • Very high EUI – unsure if can discern savings at whole building level • M&V Approach: • Option B – applied at systems level (electric only) • Option C – whole building level (electric and steam)

  11. Soda Hall Affected Systems

  12. Define the Baseline Period & Collect Data • 8 months of trended data collected • Baseline period selected to cover widest range of operating conditions ~ 3 months. • Energy use for each system to be totaled each day • Basis for analysis and reporting • “Proxy” Variables on EMCS: • Constant load equipment: measure operating kW • Equipment status becomes proxy for kW • Variable load equipment: log kW and VFD speed • VFD speed signal becomes proxy for kW

  13. “Proxy” Variable: VFD speed for kW

  14. Baseline Model: Soda Hall • Total Building Electric Building Steam • Peak Period Electric HVAC System Electric

  15. Soda Hall M&V: HVAC Systems

  16. Soda Hall: Estimated vs. Verified Savings

  17. Tan Hall • UC Berkeley’s Chemistry and Chemical Engineering Departments • 106,000 ft2 • Central Plant (475 ton chiller & associated equipment) • Steam heating • 1 Main 100% outside air VAV AHU • 4 100-HP Supply Fans • 4 60-HP Exhaust Fans

  18. Tan Hall RCx Findings

  19. M&V Approach for Tan Hall • Assessment: • Whole-building electric and steam meters present • EMS that trends all points at 1 min (COV) intervals • 8-month history of data • RCx measures in Chilled Water System and main AHU • Electric and steam savings • M&V Approach: • Option B – applied at systems level (electric only) • Option C – whole building level (electric and steam)

  20. Tan Hall Affected Systems

  21. M&V Models: Tan Hall Whole Building Electric Whole Building Steam Peak Period Electric Chilled Water System Electric

  22. Tan Hall M&V: Whole-Building Electric

  23. Tan Hall M&V: Whole-Building Steam

  24. Tan Hall M&V: Chilled Water System

  25. Tan Hall: Estimated vs. Verified Savings

  26. Shields Library • UC Davis Undergraduate Library • 400,072 ft2 • Chilled Water and Steam provided by campus central plant • 2 CHW service entrances, variable volume • 2 HW service entrances • 11 AHU, 3 VAV, 8 CAV • 5 electric meters

  27. Shields Library RCx Findings • Savings: no estimates prior to measure implementation

  28. M&V Approach for Shields Library • Assessment: • Whole-building meters present: • 5 electric meters • 2 CHW meters (installed as part of project) • 3 HW meters (installed as part of project) • EMS that trends all points at 5 min intervals • RCx measures in AHU, CHW and HW pumps • Electric, chilled water, and hot water savings • M&V Approach: • Option C – whole building level

  29. Shields Library: M&V Models Electric Chilled Water Steam

  30. Shields Library: 480V Electric Meter Savings

  31. Shields Library: Chilled Water Savings

  32. Shields Library: Hot Water Savings

  33. Costs • Including all costs, project remains cost-effective: • Soda Hall: 1.7 year payback • Tan Hall: 0.7 year payback • Shields Library: 1.0 year payback • Added costs of metering hardware and software did not overburden project’s costs • In private sector – metering costs lower • Existing electric meters • Sophisticated BAS systems • MBCx approach should be viable