JPSS POE Estimate Algorithm & Data Products. General Assumptions: NPP Launched J1 Launch J2 Launch FY12 actual cost reflects a 25% cut (reduced POP from 12 to 9 months), plus a 5% cut for SDRs and 15% cut for EDRs.
E N D
JPSS POE Estimate Algorithm & Data Products • General Assumptions: • NPP Launched • J1 Launch • J2 Launch • FY12 actual cost reflects a 25% cut (reduced POP from 12 to 9 months), plus a 5% cut for SDRs and 15% cut for EDRs. • FY13-FY16's estimates are based on the grass root estimates from Team Leads BOE updates (Nov 2011) • NPP work peaks FY12/13 • J1 work peaks FY17/18 • J2 work peaks FY22/23 • NG support is carried in a different set of budget lines • Hardware cost included in Pre-Integrator; with every 5 years a refresh • ODC including building cost, both initial setup and annual fee, based on M-squire overflow office space estimate
STAR Life Cycle for Satellite Products Development • STAR Life Cycle Satellite Products Development (For all satellites): • Calibration L-4:L+3 • Algorithm DevelopmentL-5:L-1 • Science Maintenance L:L+12 • Intensive Cal ValL:L+2 • Monitoring L:L+12 • Algorithm ImprovementL+3:L+8 • Algorithm Integration & Testing L-4:L • ODC & Management SupportL-4:L+12
2012 JPSS Algorithm and Data Products Group Baseline Profile (in K)
2012 JPSS Algorithm and Data Products Group Baseline Profile (in K)
2012 JPSS Algorithm and Data Products Group Baseline Profile (in K)
2012 JPSS Algorithm and Data Products Group Baseline Profile (in K)
2012 JPSS Algorithm and Data Products Group Baseline Profile (in K)