Page 2. PDAC Current Status. Current delivery in Mission Ops is Cycle 11.1Notable functionalities currently available:Organization of the automated procedures by CCS version, system, typeControls user access, tracks updates/versions, change historyProvides access to IMARS Standard Out Data and the Timeliner Compiler
E N D
2. Page 2 PDAC Current Status Current delivery in Mission Ops is Cycle 11.1
Notable functionalities currently available:
Organization of the automated procedures by CCS version, system, type
Controls user access, tracks updates/versions, change history
Provides access to IMARS Standard Out Data and the Timeliner Compiler
“Parses” ground database of IMARS Standard Out Date for use in compilation
Provides details on the commands and its arguments (if applicable)
Allows the user to search for commands or CVT by ops name or PUI
Produces and manages an automated procedures “package” ready for uplink
Executable (.tlx), address (.tla) and listing file (.tll)
Tracking tag file (1 file for all procedures onboard)
Swapped and unswapped files provided
LIF headers and checksum added to files destined for onboard
3. Page 3 PDAC Future Work PDAC Cycle 11.2 (comprised of minor fixes) will be available end of October
PDAC Cycle 12.0 (port to Linux)
Code inspections were complete on 8/24
Due to PDAC’s use of the SUID bit for controlling access to checked-in procedures, the method for invoking external commands had to be redesigned. PDAC currently uses the system() function provided by C, however this function does not work correctly on Linux when utilizing the SUID bit. As a result the code was changed to use fork()/exec()
Verification tests against the Level B requirements is in progress
Formal PDAC test scheduled for 2/6 – 2/21
AIX vs. Linux performance metrics shows a substantial improvement
SRs in work
Batch re-compile of automated procedures
Side-by-side DIFF listings when an automated procedure is updated
Ability to build a database of commands and telemetry in procedures so that they can be compared against a new standard out delivery and affected procedures can be easily identified