An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Implementing ISO 9001:2000

  2. Implementation Strategies • Compressed Project • Drop Dead Date • High Priority Project Management Approach • Initiate high level management involvement • Business As Usual • Low stress • Low Priority Project Management Approach • Slipping schedule not critical • Irregular Meetings • Meandering • Slipping schedule not important • Low level management support / involvement • Irregular meetings • Project tends to “Fade Away”

  3. Implementation Commandments • You cannot give someone a responsibility without publicly conferring authority to act • If top management doesn’t care, no one else will care • If planned meetings are not attended, “someone” isn’t serious about their part in the project • Track the project publicly. Publicize status weekly or bi-weekly. • Communication may not be everything, but it is the largest single stumbling block. No camps with walls.

  4. Project Scope Considerations • Single Location • Current company / facility status • Scope of registration • Training needs • Implementation strategy • Resource allotment • Multiple Locations • Single or shared certificate • Degree of shared documentation • Degree of shared data / information systems • Network Capacity /Capability • Note: Single location considerations all apply to multiple location projects

  5. Role of Consultant –Piano Teacher? • “Full Service” • On-site full-time for the duration of the project • Two or Three Week Visits • Track progress through interview (meetings) • and “Internal audits” • Internet / Phone • Verify systems documents • Discuss interpretations and systems • Answer general questions • NOTE: Training can be applied to any of the above but is on-site. • Internet / Phone is always available

  6. Deliverables • Dependent Upon The Client’s Needs and Expectations • Must Be Agreed To In Advance • May Change During Project • May Include: • Project Management • Systems Design • Systems Documentation • Training • Internal Auditing

  7. Implementation Guarantees • Some companies offer “guarantees”. Consider the details / requirements carefully. • Typical Disclaimer • “The ISO 9000 Network guarantees that your company will achieve ISO 9000, QS 9000, or ISO 14000 certification if you follow our program.”– From http://www.isonet.com/Gaurantee.htm • The time it takes to implement a systems is inversely prioritization to the company’s involvement and prioritization. As involvement and/or priority increases, time decreases. Pretty much a “no brainer”

  8. Example Guarantee Program • 8-Step Guaranteed Registration Plan • PIC has now designed a cost effective training and consulting package to help your organization achieve registration – GUARANTEED! • Our philosophy is to assist your company in developing and applying the skills necessary to plan, implement and achieve registration. • Our 8-Step Guaranteed Registration Plan Includes: • ISO/QS Introduction Seminar – Training • ISO/QS Awareness Sessions – Training • ISO/QS Needs Assessment – Consulting • ISO/QS Implementation/Documentation – Training • ISO/QS System Development, Consulting, Coaching, Training • Choosing a Registrar Consulting • Part A: ISO/QS Internal Auditor Training • Part B: Internal Auditor Site Coaching – Training • 8. Part A: Pre-Assessment Audit – Consulting • Part B: Registration Audit - Consulting

  9. Example Project Plan

  10. General Registration Path • Assess your situation(Pre-assessment) • Also called Gap Analysis • Define a plan with time line & begin • Interview and choose registrar • Documentation processes • Manager transitional activities • Registrar document review • Registrar document review • Registrar pre-assessment • Corrective actions • Registration audit • Implementation time frame: 3month to 2years

  11. Typical Failure Modes • Can’t explain systems and/or documentation • Lack of management involvement • Personnel not following documentation • Poor communication and/or training • Lack of documentation • No or inadequate document control • Poor record keeping and systems

  12. Critical Success Factors • Dedicated “Company Knowledgebase” • (Coordinator and/or Management Representative) • Pre-assessment(document and interview) • Involved, supportive top management • Receptive culture • Focus on business rather than functional areas • Prioritize processes based on customer needs, • anticipated benefits, and potential for success

  13. Implementation Costs • IRS Revenue Ruling 2000-4 • Implementation costs are tax deductible in the same year. • Registration costs and registration upkeep costs are tax deductible in the same year. • Internal map hours • Internal capital expenses • Consultant fees

  14. Some Thoughts

  15. “Standard” Documentation Pyramid Tier 1 Quality Systems Manual Tier 2 Policies & Gen. Op. Procedures Tier 3 Inter- Departmental procedures Product & Process Documents Tier 4 Forms & Tags Objective Evidence Records Tier 5 Ad Hoc. Temporary Documents Corporate Manual Tier 2 Flow Charts & Procedures Department & Location Specific Department & Location Specific Situation Specific Define Approach Through Policies Defines Who,What and When “Things” Happen These describe Tier 3 Sub-Systems Answer How Things Happen- The Individual Steps. These describe Tier 4 Elements. Three Result –Evidence of Occurrence such as SPC Data Sheets These are typically temporary Investigative documents

  16. Documentation • Organization Charts • Procedures • Forums • Tags • Prints • Specifications • Statistical Data • Inspection & Test Results

  17. Myths vs. Truths • Documentation Is Meant To Be Easily Changed • The Less Documentation , The Better

  18. Basic Rules • Your Job & Documentation • SAY What You Do • Documentation • DO What You Say You Do • Actions • If It’s Not WRITTEN Down, It DIDN’T Happen

  19. Real Life • What QS/ISO 9000 Means To You • You MUST: • Know Your Job Duties • Know What Training Your Job Requires • Be Able To Tell About How You Were Trained • Know What Documentation Involves YOU! • Know How To Find Out What The“Latest” Version Is • Know What The Documentation Says • Know How The Documentation Applies To You ! • Know What The INTENT of the Documentation