200 likes | 360 Views
Telescope Optical Units ( TOUs). Overview of the TOU Team organization during PLATO 1.0 & TOU timeline and plans during phase B1/B2. TOU Team Meeting Catania 11 June 2014. Isabella Pagano (TOU PM). ICU R. Cosentino. TOUs during PLATO 1.0 organization. Payload. PLATO Payload
E N D
Telescope Optical Units (TOUs) Overview of the TOU Team organization during PLATO 1.0 & TOU timeline and plans during phase B1/B2 TOU Team Meeting Catania 11 June 2014 Isabella Pagano (TOU PM)
ICU R. Cosentino TOUs during PLATO 1.0organization Payload PLATO Payload Management PIPM: P. Bodin Instrument System Coordinator P. Levacher DPS Management B. Pontet Camera Management D. Laubier TOU R. Ragazzoni Normal TOU R. Ragazzoni Normal DPU Ph. Plasson Fast TOU W. Benz Hardware & boot software M. Mas FPA/FEE D. Walton/M. Mas Application software Ph. Plasson Fast DPU G. Peter Prototype & FM AIV P. Levacher Algorithms R. Samadi AEU S. Fredon TOU Meeting
TOUs during PLATO 1.0organization N-TOU and F-TOU delivered by IT in the PLATO 2.0 plan
TOUs during PLATO 1.0Our mandate Provide optical – mechanical design performing as required by Science Compliant with the assigned budget Feasible in the due time Reliable in the given environments TOU Meeting
TOUs during PLATO 1.0How we managed A large team: • INAF • Padova • Catania • Milano • Univ. Bern • Stockolms Obs. • Univ. Firenze • Industrial Partners • Selex • Medialario-Sagem • Seso • RUAG • APCO Technologies TOU Meeting
TOUs during PLATO 1.0How we managed • A huge number of meetings/telecons: • TOU Team • Bilateral TOU-System Teams • TOU-FPA System Teams A large team: • INAF • Padova • Catania • Milano • Univ. Bern • Stockolms Obs. • Univ. Firenze • Industrial Partners • Selex • Medialario-Sagem • Seso • RUAG • APCO Technologies TOU Meeting
TOUs during PLATO 1.0How we managed Breadboard/Prototype • Design (Optics, Mechanics, Thermal, ..) • Demonstration Activities • TOU AIV procedure • TOU Optical and Thermal Performances • TOU Optical Lenses Procurement • Feasibility Studies • TOU MAIT and Management Plan • TOU optical coating plan • TOU aspherical lens manufacturability & procurement plan • TOU AlBeMet® Structure Procurement Plan TOU Meeting
BreadBoard/Prototype “pre-breadboard” the structure built with off-the-shelf lenses used to test GSE and procedures to be used with the breadboard. “breadboard” the structure built to test alignment in warm and cold environment before the I-PRR “prototype” the structure built after the I-PRR, during the Phase B1 (in the PLATO 1.0 context) , obtained from the breadboard, replacing the L1 and L2 lenses. TOU Meeting
TOUs during PLATO 1.0What we delivered - Officially At I-PRR (deadline April 2011) PMC TOU plans Source: TOU Team - Date: 4 May 2011 PLATO TOU Project Management Plan: Source: Selex, 20 April 2011 PLATO TOU MAIT Plan: Source: Selex, 20 April 2011 PLATO aspherical lens (ref.11-6219 ed03): preliminary technical, management proposal– Source: Medialario/Sagem-Reosc, 3 May 2011 PLATO Coating - Source: Selex, 22 April 2011 PLATO TOU Design Report: Source: TOU Team, Date 18 April 2011 - included in the 02_Payload-design-report_draft11.pdf TOU Meeting
TOUs during PLATO 1.0What we delivered – Unofficially 1/2 Not included in any package to ESA but delivered to CNES and O. Piersanti (former ESA PM) between March and July 2011: CaF2 lens blank: Thermal Vacuum Test Report - Filename: PLATO-CAMTOLE-RP-154-CNES, Issue 1, Rev. 0, Date: Jul 21st 2011, Prepared by: H. Pasquier - delivered to Piersanti Vibration Test Report: L3 CaF2 Vibration Test Dummy - Filename: Test_509_PLATO_dummy_lens_mount__report.pdf - Authors: M. Greber, D. Piazza, K. Seiferlin, P. Christiansen, 20th Jun 2011 - delivered to CNES and Piersanti PLATO TOU Breadboard/Prototype: Design and AIT Reportfilename: PLATO-INAF-TOU-RP-0013-issue02-rev0-2.pdf- Authors: J. Farinato, V. Viotto, D. Piazza et al., Issue 2, Rev. 0, Date: 13 Jul 2011 - delivered to CNES and Piersanti TOU Meeting
TOUs during PLATO 1.0What we delivered – Unofficially 2/2 AlBeMet® Structure Procurement Report - author "APCO Technologies” – delivered to CNES on May 12 2011 Study on the aspherical lens performed by RUAG - delivered to CNES oo 18 Jul 2011 Less relevant… PLATO TOU - Letter of Interest - author: SAGEM/REOSC - delivered to Osvaldo Piersanti (ESA) (March 2011) PLATO TOU - Letter of Interest - author: SESO - delivered to Osvaldo Piersanti (ESA) (March 2011) TOU Meeting
TOUs during PLATO 1.0What we left open • Optical Design Consolidation • see Magrinpresentation for details • Breadboard activities • see Farinato et al. presentation for details • Mechanical Design • Finite Element Model of the current mechanical design, including evaluation of the first eigenfrequency. • Interfaces • Verification of the interfaces of the finite element model with the lenses and their effects. • Filter design • Engineering consolidation TOU Meeting
PLATO 2.0 TOU 2.0 TOU Meeting
PLATO 2.0 timeline – Phase B2Jul 2014-Jan 2016 Premises • Phase B1 kick-off: Jul 2014 • Science Management Plan approval: Nov 2015 • Payload Development and Consolidation Review: March 2015 • SRR data package: 1 Nov 2015 • SRR: completed by Jan 2016 • Mission adoption & IPC approval: Feb-Mar 2016 TOU Meeting
PLATO 2.0 timeline – Phase B2C/D/E1Q1 2016-Q1 2024 Premises • Industrial ITT for Phases B2/C/D/E1: Apr-Sep 2016 • Industrial Prime contractor kick-off: Oct 2016 • System PDR: by 2017 (tbc) • System CDR: by mid-2020 (tbc) • Payload CDR by 2018 (tbc) • Delivery of all Cameras: Q4 2021 • PLATO Launch: Q1 2024 TOU Meeting
Phase B1: SRR Objectives 1/2 Premises • PLATO Phase B1 objective is the adoption of the PLATO mission by SPC in Feb-March 2016. • The PLATO System Requirements Review (SRR) to be completed by January 2016 is a major input to PLATO mission adoption. • The SRR is a formal review (category 1 i.e organized by ESA inspector general, D/SRE is the chairman). • The primary objective of the SRR is to review in detail: • The final payload and spacecraft system specifications, • The payload and spacecraft design definition, • The payload and spacecraft development and verification program, • Mission programmatic and cost. TOU Meeting
Phase B1: SRR Objectives 2/2 Premises ?? • The camera development schedule is critical, and is actually defining the schedule critical path for the spacecraft. Hence: • The camera detailed design activities (including AIV plans and Ground System Equipment design) shall be completed before the SRR, • The critical bread-boarding activities (e.g. electronics Demonstration Models, optics) shall be initiated during phase B1, • Consortium input to the SRR shall demonstrate that the camera Engineering Model - which is fully representative of the flight model except for some electronics parts - will be completed by early 2017, • A detailed development plan of the payload shall demonstrate by SRR that: • serial production phase will start by mid-2017, • the first batch of 8 cameras will be delivered in November 2020, • the last batch of cameras will be delivered by November 2021. TOU Meeting
TOUs during PLATO 2.0Phase B1 goal Our proposal: deliver all ready but undelivered documents: • Design: • Consolidated TOU Design Report (Optical Design, Mechanical Design, Thermal Analysis, Stray-light Analysis, Optical Material Analysis and Coating Design, ..) • Breadboard: • ConsolidatedBreadBoard AIV report • NEW: including a critical review of results and assessment of some open issues • CaF2 tests • AIV Design: • Consolidated TOU MAIT and Management Plan • ConsolidatedAlBeMet® Mechanical Structure Procurement Assessment Study • NEW: F-TOU Filters Design Procurement Assessment Study
TOUs during PLATO 2.0Phase B2 goal • Design: • Engineering of TOU Design (Optical Design, Mechanical Design, Thermal Analysis, Stray-light Analysis, Optical Material Analysis and Coating Design, ..) • Breadboard Prototype • Lens set like the FM one (change of 2 lenses and replacement of one lens previously accepted with no conformance issue because short in time • optical quality test (in term of PSF shape and dimension) on the whole FoV. • AIV Design: • Finalized TOU MAIT and Management Plan • FinalizedAlBeMet® Mechanical Structure Procurement Study • Consolidated: F-TOU Filters Design Procurement Assessment Study TOU Meeting
When Industrial Prime Contractor? Our proposal: • During Phase B1, industry will deliver consult and services. • We’ll work to have ASI delivers a ITT for Phase B2/C contract, not later than March 2015. • Goal: • TOU Prime Contractor at work at beginning of Phase B2, but clearly identified before the SRR. TOU Meeting