An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Company Training Course Session 2: Responsible Production

  2. Contents 1 • Background • Objectives • Introduction to the Responsible Production Model • Five steps of the Responsible Production Model • Introduction to mock case study • Topics for discussion 2 3 4 5 6

  3. Background • The Responsible Production approach is build upon a 5 step model for assisting companies to improve chemical safety management and risk communication in their organization and among their stakeholders. • Preparedness for emergencies that may result in off-site consequences requires the development and implementation of an integrated emergency response plan, assuring the necessary linkages with the roles of relevant external stakeholders in emergency preparedness and response. 1 2 3 4 5 6

  4. Objectives 1 • To introduce participants to the 5-step approach of the Responsible Production modular approach, and present the list of tools available in the Responsible Production Toolkit. • To introduce participants to the mock case study that may be used to support course exercises 2 3 4 5 6

  5. What is Responsible Production? 1 • It is a systematic and continuous improvement approach aimed at SMEs for : • Chemical safety along the value-chain; • Understanding hazards; • Controlling chemical exposure; • Reducing accident risks; • Engaging stakeholders; and • Promoting chemical product stewardship through risk communication aimed at preventing exposure and accidents with hazardous substances along the value chain. 2 3 4 5 6

  6. Chemical Product Stewardship 1 “…the practice of making health, safety and environmental protection an integral part of the life cycle of chemical products.” (ICCA Product Stewardship Guidelines, 2007) 2 3 4 5 6

  7. Responsible ProductionAims and Rationale 1 • Need to foster safe work practices and chemical safety information along the chemical industry value chain, (involving not only the producers but also their suppliers, transporters, end customers, and other relevant business partners) • An integrated approach to chemicals safety and chemical product stewardship can not be implemented without the identification and engagement of the relevant stakeholders along the value chain 2 3 4 5 6

  8. Responsible ProductionA focus on SMEs 1 • Small and Medium Sized companies (SMEs) in many developing countries form the backbone of the industrial sectors where hazardous chemicals are manufactured, transported, repackaged and used • SMEs can benefit from an integrated guidance on safer production and safer chemicals handling specially addressed to their needs and to the needs of their business partners along the value-chain, including end customers and the affected communities 2 3 4 5 6

  9. Introduction to the RP model 1 • The Responsible Production approach includes practical guidance and tools for assisting companies in: • identifying and understanding the hazards and risks related to the company products and operations; • identifying opportunities for reducing risk and costs; • identifying and engaging with business partners and communities to improve safety and preparedness for accidents with chemical products; • promoting risk communication and product risk information along the value chain; • training workers and business partners in chemical safety; • improving procurement systems to include chemical safety management; • measuring and communicating performance in a transparent way. 2 3 4 5 6

  10. Introduction to the RP model • The Responsible Production model : • is not meant to be a stand alone management system. It is meant to be integrated with existing management practices and procedures already existing in chemical companies • is not intended to replace existing practices but to provide an additional approach to managing hazards and risks, within an wider concept of “risk objects” (i.e. other stakeholders in addition to company workers, such as business partners, customers and end users, the authorities and communities may be subject to risks posed by hazards in a companies operations) 1 2 3 4 5 6

  11. The 5 steps of the the RP model 1. IDENTIFY RESPONSIBLE PRODUCTION ISSUES 2. GET THE RIGHT PEOPLE INVOLVED 3. DEVELOP YOUR PLAN 4. PUT THE PLAN INTO PRACTICE, TRAIN AND COMMUNICATE 5. EVALUATE HOW WELL YOU DID • The RP model includes 5 steps: • Together, these steps provide a systems approach to managing the risks and impacts associated with chemical hazards, through a CSR aligned, value-chain approach. 1 2 3 4 5 6

  12. Section 1: Identify Responsible Production Issues RISK ASSESSMENT AND PRIORITISATION STANDARDS, CODES, LAWS AND REGULATIONS OPERATIONAL PROCESSES RISK ASSESSMENTAND PRIORITISATION CHEMICAL IDENTIFICATION AND HAZARD CLASSIFICATION STANDARDS, CODES AND REGULATIONS CHEMICAL INVENTORY AND HAZARD CLASSIFICATION HAZARD HOTSPOTS MAP LEGAL REGISTER PROCESS FLOW ANALYSIS RISK IDENTIFICATION 1 1. IDENTIFY RESPONSIBLE PRODUCTION ISSUES Basic Tools Advanced Tools Tool 1.1 Prepare process flow chart Tool 1.6 Hazard Classification (Control Banding) 2 UNDERSTAND THE PROCESS FLOW Tool 1.2 Chemical inventory and Hazard Classification Tool 1.3 Identify Risks Tool 1.4 Hazard Hotspots Map 3 Tool 1.5 Legal register 4 5 6

  13. Section 2: Get the Right People Involved • STAKEHOLDER ID • STAKEHOLDER ENGAGEMENT • REVIEW OF ENGAGEMENT PROCESS 2. GET THE RIGHT PEOPLE INVOLVED Basic Tools Advanced Tools • STAKEHOLDER MAP • ENGAGEMENT METHODS REVIEW OF ENGAGEMENT PROCESS AND PLAN • ENGAGEMENT PLAN Tool 2.1 Map Stakeholders IDENTIFY YOUR STAKEHOLDERS • ISSUE PRIORITIZATION • STAKEHOLDER PROFILES Tool 2.2 Profile Stakeholders UNDERSTAND YOUR STAKEHOLDERS AND HOW THEY ENGAGE Tool 2.3 Select the engagement method Tool 2.4 Plan the engagement ENGAGE YOUR STAKEHOLDERS Tool 2.5 Prioritise issues PRIORITSE STAKEHOLDER ISSUES Tool 2.6 Review Engagement Process REVIEW THE ENGAGEMENT PROCESS 1 2 3 4 5 6

  14. Section 3: Develop your Plan • IDENTIFY ACTIONS, UNDERSTAND THE COSTS AND • SET CHEMICAL OBJECTIVES, TARGETS AND INDICATORS • DEVELOP CHEMICAL CONTROL ACTION PLAN, TRAINING PLAN, AND EMERGENCIES PLAN • IDENTIFY ACTIONS FOR RISK REDUCTION • COST ANALYSIS CHEMICAL CONTROL ACTION PLANS • TRAINING PLAN • EMERGENCIES PLAN • SETTING GOALS, OBJECTIVES, TARGETS, AND INDICATORS 3. DEVELOP YOUR PLAN Basic Tools Advanced Tools Tool 3.1 Identify Actions for Risk Reduction Tool 3.2 Risk Reduction Cost Analysis Tools 3.7 to 3.11 Prevent and Reduce Risk (per activity) IDENTIFY OPPORTUNITIES FOR RISK AND COST REDUCTIONS BUILD AND COMMUNICATE THE BUSSINESS CASE Tool 3.12 Business Case Tool 3.3 Set goals, objectives, targets and indicators SET CHEMICAL OBJECTIVES, TARGETS AND INDICATORS Tool 3.4 Chemical Control Action Plan PREPARE CHEMICAL CONTROL ACTION PLANS DEVELOP TRAINING NEEDS ASSESSMENT AND PLAN Tool 3.5 Training plan DEVELOP EMERGENCIES PLAN Tool 3.6 Emergencies plan 1 2 3 4 5 6

  15. Section 4: Put Plan into Practice, Train and Communicate Basic Tools Advanced Tools 4. PUT PLAN INTO PRACTICE, TRAIN AND COMMUNICATE Tool 4.1 Best Practices Procedures Tool 4.2 Develop Training Materials Tool 4.5 Procurement Checklists DEVELOP AND IMPLEMENT BEST PRACTICE PROCEDURES TRAIN YOUR WORKERS AND BUSINESS PARTNERS Tool 4.3 Risk Communication Tool 4.4 Product Risk Information FOSTER RISK COMMUNICATION IMPROVE YOUR PROCUREMENT PRACTICES 1 2 3 4 5 • DEVELOP AND IMPLEMENT BEST PRACTICES • TRAINING AND RISK COMMUNICATION • DEVELOPING TRAINING MATERIALS • RISK COMMUNICATION • PRODUCT RISK INFORMATION 6 BEST PRACTICES PROCEDURES • PROCUREMENT • PROCUREMENT CHECKLIST

  16. Section 5: Evaluate How Well you Did EVALUATE PERFORMANCE AND MANAGEMENT PRACTICES COMMUNICATE PERFORMANCE PROVIDE ASSURANCE 1 5. EVALUATE HOW WELL YOU DID Basic Tools Advanced Tools Tool 5.1 Performance Assessment Tool 5.2 Management Assessment 2 Tool 5.3 External Communications 3 Tool 5.4 Independent Assurance 4 • EVALUATE PERFORMANCE AND MANAGEMENT PRACTICES • COMMUNICATE PERFORMANCE • PROVIDE ASSURANCE 5 • PERFORMANCE ASSESSMENT PROTOCOL EXTERNAL COMMUNICATIONS 6 INDEPENDENT ASSURANCE • MANAGEMENT ASSESSMENT PROTOCOL

  17. Introduction to mock case study • Company XYZ, Ltd mixes and distributes liquid paints (inks). • Plant site and its surroundings: 1 2 3 4 N S 5 6

  18. Activity and site description • The operations carried out on the site are limited to mixtures at ambient temperature without any chemical reaction. • The site is composed of : • Raw materials storage: Raw materials are stored in plastic barrels (220 L) laid out on pallets, on a specific curbed (for the collection of eventual liquid releases on the ground) ground marked area. • Process room: where the mixtures for the paints manufacture are carried out. The mixing is undertaken in a nitrogen-inerted, stainless steel vessel. • A washdown (washing area) for the barrels. • A laboratory, where the process control takes place. Personnel sample and test finished products to ensure that the compositions are correct before dispatching. 1 2 3 4 5 6

  19. The site is composed of (continued): • Finished products storage area: Area with filmed containers, on standby for being dispatched. • Waste storage area. This area has a retention basin for the capture of eventual leakages. • Open-air area for the storage of solvents in bulk : 4 reservoirs of 20 m3 in a retention basin (1 reservoir is not being used. There are also some 20 IBCc of Ethanol being stored inside the retention basin) • A boiler room: boiler with natural gas 1 2 3 4 5 6

  20. The process • The raw materials conditioned in barrels are conveyed by truck and are stored in the warehouse, on a specific ground marked area. • Then, for the manufacture of the mixture, the necessary raw materials are brought in the process room: the barrels are placed in a mezzanine and are discharged in a fixed tank. Unloading is carried out by gravity using a flexible hose. There are usually 5 to 15 barrels (220 L) of raw materials in the process room. The paint manufacture is done by continuous addition of a solvent, in the tank equipped with a mixing device. The solvent is transferred by gravity, by overhead pipelines located outside. • The unloading of the mixture is carried out in mobile containers: the vessel feeds a dosing device equipped with a number of valves corresponding to the number of material components. The valves are equipped with jack-valves allowing the output flow-rate control (weight control). After each use, they are washed by solvent circulation. 1 2 3 4 5 6

  21. The process (continued) 1 • After being closed by a lid, the paints are manually transferred into the dispatching in zone. • The barrels and the vessels area are washed: the operation consists in sprinkling the edges of the containers with a solvent using a steel pipe finished by a flexible PVC hose. • The washer is a brush that acts by friction. The operation is carried out under a closed lid. The sealing is ensured by joints and the used solvent is continuously extracted to a dedicated tank. • The site is heated due to a natural gas boiler 2 3 4 5 6

  22. Materials at site • Solvents : • Ethanol • N-propyl acetate • solvent of washing • dirty solvent • Raw materials: • They are primarily varnish and concentrates: these preparations are not done in the site. • (these are supplied by Supplier C in plastic barrels (220 L) • Their composition is mainly a mixture of water, waxes, resins, certain coloured pigments, and various additives. Some material are combustible and can release dangerous fumes if exposed or under fire. For example, additive ABB5 present in many formulations, is likely to generate an ammonia outburst in combustion. • The raw material storage area has a capacity of 550 barrels Supplier A: Ethanol and N-propyl acetate in bulk (each in road tankers of 15,000 litres) Supplier B: Ethanol in 1,000 litres Intermediate Bulk Containers (IBC)’s 1 2 3 4 5 6

  23. Materials at site • Finished product: • Filmed pallets with paints in containers (cans) of 15, 25, and 75 Liters • There is usually an average of 120,000 Liters in the finished products storage area • Waste storage area: • In the waste storage area are being stored several different types of containers and waste products, including unidentified IBCc, 220 L barrels, and several containers with damaged finished product • There is no information of the quantities of waste materials being stored. • Laboratory: • Small quantities of reagents and other materials, including flammable and toxic chemicals 1 2 3 4 5 6

  24. Topics for discussion… • Rationale behind each of the 5 steps in the RP model • Benefits of the RP approach and its tools for helping companies in improving their safety practices 1 2 3 4 5 6