Reducing Energy Consumption

Reducing Energy Consumption. The DWP approach Case Study 3. DWP’s Strategic Objectives. To ensure the best start for all children and end child poverty by 2020; To promote work as the best form of welfare for people of working age, while protecting the position of those in greatest need;

afra
Download Presentation

Reducing Energy Consumption

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Reducing Energy Consumption The DWP approach Case Study 3

  2. DWP’s Strategic Objectives • To ensure the best start for all children and end child poverty by 2020; • To promote work as the best form of welfare for people of working age, while protecting the position of those in greatest need; • To combat poverty and promote security and independence in retirement for today’s and tomorrow’s pensioners; • To improve rights and opportunities for disabled people in a fair and inclusive society; and • To ensure customers receive a high quality service, including high levels of accuracy.

  3. DWP Core Business • Three key customer inter-face businesses: • Jobcentre Plus • Pensions, Disability and Carers Service • Child Support Agency

  4. Estate • Second largest Government department • 1,200 sites nationwide • 100,000 employees • Annual utilities expenditure expected to exceed £35 million this year

  5. DWP Energy Costs

  6. PFI arrangement • Most buildings form part of a PFI arrangement with Land Securities Trillium (LST). • The contract with LST: • Carries a target to reduce consumption of utilities year on year by 2%. • Includes a penalty clause if LST fail to achieve this target. • Allows for any financial savings to be shared equally between DWP and LST.

  7. Invest to Save • All sites have been allocated a priority rating 1 – 3 based on size • and energy consumption. • 75 Priority 1 sites account for 33% of total energy consumption • enabling targeted investment targeted at sites with highest • consumption levels.

  8. Spend to Save • 38,000 ‘Spend to Save’ investments costing over £2 million and include: • Waterless urinals • Savawatts • Tea boiler timers • Proximity sensors • Automated meter reading equipment being rolled out.

  9. Ontario House Story Talked to DWP SD team to establish a site in NW that - Was a high energy user. Had facility for automated meter readings – ‘Clarity’ reports. Jobcentre Plus sole occupier

  10. Sample of a ‘Clarity’ report

  11. Achieving Buy In • Arranged a meeting with: • Ontario House committee representatives. • LST Environmental Manager for NW GOR. • LST Business Support Manager for Ontario House. • EDS

  12. Getting Started • Arranged a further meeting with all members the House Committee in Ontario House. – including the JCP Regional Performance Manager. • Raised awareness of the powerful data produced in Clarity reports. • Raised awareness of Government SD targets. • Discussed and agreed 5 simple steps that would lead to reduce energy consumption. • Agreed communication and publicity strategy.

  13. Simple steps to efficiency • Switched off lights in rooms not in use and at end of day • Switched off all electrical equipment at end of day • Switched off monitors when leaving workstation for more than 15 minutes • ‘Card out – Monitor off’ • Use of kettles stopped – water heaters to be used instead at all times • Reviewed timers to ensure that they are appropriately set

  14. Key factors to success Accurate and meaningful data through Clarity reports enabling the identification of waste. Ability to compare results week on week, month on month. High level of support, personal involvement from LST and use of their expertise. Total commitment of staff and Managers to ‘make it work’.

  15. Engaging People • DWP and LST working together to raise awareness of staff through ‘Relaunched Initiative – Saving Energy’. • LST’s Building Service Managers incentivised to improve energy performance of buildings. • Guidance and advice provided on DWP intranet site, includes site-by-site information on utilities consumption. • Production of ‘Greenlines’ a departmental magazine. • Carbon Awareness Event. • DWP SD conference spotlighting carbon emissions and supported by Department’s SD Minister, Lord McKenzie.

  16. Next Steps: Estates • Site specific ‘Spend to Save’ eg lighting at Document Management Unit • Large scale schemes – biomass, wind, solar. • ‘End-of-life plant and equipment replacements. • Continued roll out of automated meter reading installations.

  17. Next Steps: Working Practices • Ensuring that there is a consistent approach to SD impact assessment amongst strategists, planners and process designers. • Permanent Secretary has Sustainable Development as a Personal Objective. • New governance structures provide Board level involvement in the SD agenda. • Targets disaggregated to each DWP business.

  18. Next Steps: People • Businesses establishing own SD teams – DWP now working more closely with these teams. • Improved communications through an SD Communications Strategy. • Establishing a leadership culture that embraces the SD agenda. • Seeking to change behaviours and practices. • Jobcentre Plus piloting site-specific customised team brief and planned roll-out of Ontario House project.