280 likes | 289 Views
Explore our advanced robotic welding systems for efficient MIG welding of excavator center sections and railway wagon side walls. We offer tailored solutions with additional axes and positioners. Enhance your welding processes with our servo-controlled manipulators. Contact us for valve-related welding automation needs.
E N D
Survey No. 500/5, 6, 7 & 8, Amarambedu, Kundrathur Post, Chennai – 600069, Tamil Nadu, India www.primoautomation.com Prepared For: Presented By: Date:
PRIMO AUTOMATION SYSTEMS ROBOTIC WELDING
PRIMO AUTOMATION SYSTEMS 2 STATION 2 ROBOT WITH 8M LONG SLIDER WITH 4 ADDITIONAL AXES WITH 2 HEAD AND TAIL STOCKS FOR MIG WELDING OF EXCAVATOR CENTER SECTION
PRIMO AUTOMATION SYSTEMS 2 STATION WITH 2 NOS OF SLIDER MOUNTED ROBOTS WITH 6 ADDITIONAL AXES WITH 2 SKY HOOK POSITIONERS FOR MIG WELDING OF EXCAVATOR CENTER FRAME
PRIMO AUTOMATION SYSTEMS 2 STATION WITH 2 NOS OF SLIDER MOUNTED ROBOTS WITH 6 ADDITIONAL AXES WITH 2 SKY HOOK POSITIONERS FOR MIG WELDING OF EXCAVATOR CENTER FRAME
PRIMO AUTOMATION SYSTEMS 2 STATION 1 ROBOT WITH 2 ADDITIONAL AXES WITH 2 HEAD AND TAIL STOCK MANIPULATORS MIG WELDING WORK CELL FOR EXCAVATOR FUEL & OIL TANK WELDING
PRIMO AUTOMATION SYSTEMS 2 STATION 1 ROBOT WITH 2 ADDITIONAL AXES WITH 2 HEAD AND TAIL STOCK MANIPULATORS MIG WELDING WORK CELL FOR EXCAVATOR FUEL & OIL TANK WELDING
PRIMO AUTOMATION SYSTEMS 2 STATION 1 ROBOT WITH 2 ADDITIONAL AXES WITH 2 HEAD AND TAIL STOCK MANIPULATORS MIG WELDING WORK CELL FOR EXCAVATOR FUEL & OIL TANK WELDING
PRIMO AUTOMATION SYSTEMS 1 STATION 1 GANTRY MOUNTED ROBOT WITH 2 ADDITIONAL GANTRY AXES FOR MIG WELDING OF RAILWAY GOODS WAGON SIDE WALL WELDING
PRIMO AUTOMATION SYSTEMS 1 STATION 1 GANTRY MOUNTED ROBOT WITH 2 ADDITIONAL GANTRY AXES FOR MIG WELDING OF RAILWAY GOODS WAGON SIDE WALL WELDING
PRIMO AUTOMATION SYSTEMS SERVO CONTROLLED HEAD AND TAIL STOCK MANIPULATORS TO SERVE AS ADDITIONAL AXES FOR ROBOTIC WELDING
PRIMO AUTOMATION SYSTEMS 1 STATION 1 ROBOT MIG WELDING WORK CELL WITH HEAD & TAIL STOCK MANIPULATOR FOR ASSEMBLING, ORIENTING & WELDING OF HYDRAULIC CYLINDER BARREL TO CAP END COVER WITH AUTOMATIC BARREL LOADING AND UNLOADING SYSTEM
PRIMO AUTOMATION SYSTEMS 2 STATION 1 ROBOT 4 PARTS TOOLING FOR LINCOLN ROBOTIC WELDING WORKCELL
PRIMO AUTOMATION SYSTEMS 2 STATION 1 ROBOT 4 PARTS TOOLING FOR LINCOLN ROBOTIC WELDING WORKCELL
PRIMO AUTOMATION SYSTEMS 2 STATION 1 ROBOT 4 PARTS TOOLING FOR LINCOLN ROBOTIC WELDING WORKCELL
PRIMO AUTOMATION SYSTEMS 1 STATION 1 SLIDER MOUNTED WITH HEAD AND TAILL STOCK MANIPULATOR WITH TOOLINGFOR RUBBER EXTRUDER SCREW HARDFACING
PRIMO AUTOMATION SYSTEMS 1 ROBOT 1 STATION RUBBER MACHINERY EXTRUDER SCREW HARDFACING
PRIMO AUTOMATION SYSTEMS 1 ROBOT 2 STATION TRACTOR WHEEL TO LUG WELDING WORK CELL WITH TILTABLE MANIPULATORS FOR OPERATOR SAFETY WHILE LOADING.
PRIMO AUTOMATION SYSTEMS 2 ROBOT 2 STATION TRUCK PROPELLAT SHAFT ASSEMBLY AND WELDING SYSTEM INTEGRATED WITH LASER SCANNERS
PRIMO AUTOMATION SYSTEMS 2 ROBOT 1 STATION AXLE BRACKET WELDING WORKCELL WITH ASSEMBLY FIXTURE AND MATERIAL HANDLING AUTOMATION
PRIMO AUTOMATION SYSTEMS 1 ROBOT 2 STATION AXLE BRACKET WELDING WORKCELL
PRIMO AUTOMATION SYSTEMS 1 ROBOT 1 STATION AXLE REINFORCEMENT RING AND COVER WELDING WORKCELL WITH 2 AXES POSITIONER WITH HYDRAULICALLY OPERATED TOOLING.
PRIMO AUTOMATION SYSTEMS 1 ROBOT 1 STATION AXLE REINFORCEMENT RING AND COVER WELDING WORKCELL WITH 2 AXES POSITIONER WITH HYDRAULICALLY OPERATED TOOLING.
PRIMO AUTOMATION SYSTEMS 2 ROBOT 2 STATION BRAKE SHOE MIG WELDING WORKCELL WITH HYDRAULICALLY OPERATED TOOLING.
PRIMO AUTOMATION SYSTEMS 2 ROBOT 2 STATION BRAKE SHOE MIG WELDING WORKCELL WITH HYDRAULICALLY OPERATED TOOLING.
PRIMO AUTOMATION SYSTEMS 2 ROBOT 2 STATION 4 TORCH AXLE HOUSING LINEAR MIG WELDING WORKCELL WITH HYDRAULICALLY OPERATED TOOLING.
PRIMO AUTOMATION SYSTEMS 2 ROBOT 2 STATION 4 TORCH AXLE HOUSING LINEAR MIG WELDING WORKCELL WITH HYDRAULICALLY OPERATED TOOLING.
PRIMO AUTOMATION SYSTEMS WE LOOK FORWARD TO WORKING TOGETHER WITH YOU FOR YOUR VALVE RELATED WELDING / OVERLAY AUTOMATION NEEDS