1 / 28

Robotic Welding Solutions for Excavator & Railway Applications

Explore our advanced robotic welding systems for efficient MIG welding of excavator center sections and railway wagon side walls. We offer tailored solutions with additional axes and positioners. Enhance your welding processes with our servo-controlled manipulators. Contact us for valve-related welding automation needs.

afrew
Download Presentation

Robotic Welding Solutions for Excavator & Railway Applications

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Survey No. 500/5, 6, 7 & 8, Amarambedu, Kundrathur Post, Chennai – 600069, Tamil Nadu, India www.primoautomation.com Prepared For: Presented By: Date:

  2. PRIMO AUTOMATION SYSTEMS ROBOTIC WELDING

  3. PRIMO AUTOMATION SYSTEMS 2 STATION 2 ROBOT WITH 8M LONG SLIDER WITH 4 ADDITIONAL AXES WITH 2 HEAD AND TAIL STOCKS FOR MIG WELDING OF EXCAVATOR CENTER SECTION

  4. PRIMO AUTOMATION SYSTEMS 2 STATION WITH 2 NOS OF SLIDER MOUNTED ROBOTS WITH 6 ADDITIONAL AXES WITH 2 SKY HOOK POSITIONERS FOR MIG WELDING OF EXCAVATOR CENTER FRAME

  5. PRIMO AUTOMATION SYSTEMS 2 STATION WITH 2 NOS OF SLIDER MOUNTED ROBOTS WITH 6 ADDITIONAL AXES WITH 2 SKY HOOK POSITIONERS FOR MIG WELDING OF EXCAVATOR CENTER FRAME

  6. PRIMO AUTOMATION SYSTEMS 2 STATION 1 ROBOT WITH 2 ADDITIONAL AXES WITH 2 HEAD AND TAIL STOCK MANIPULATORS MIG WELDING WORK CELL FOR EXCAVATOR FUEL & OIL TANK WELDING

  7. PRIMO AUTOMATION SYSTEMS 2 STATION 1 ROBOT WITH 2 ADDITIONAL AXES WITH 2 HEAD AND TAIL STOCK MANIPULATORS MIG WELDING WORK CELL FOR EXCAVATOR FUEL & OIL TANK WELDING

  8. PRIMO AUTOMATION SYSTEMS 2 STATION 1 ROBOT WITH 2 ADDITIONAL AXES WITH 2 HEAD AND TAIL STOCK MANIPULATORS MIG WELDING WORK CELL FOR EXCAVATOR FUEL & OIL TANK WELDING

  9. PRIMO AUTOMATION SYSTEMS 1 STATION 1 GANTRY MOUNTED ROBOT WITH 2 ADDITIONAL GANTRY AXES FOR MIG WELDING OF RAILWAY GOODS WAGON SIDE WALL WELDING

  10. PRIMO AUTOMATION SYSTEMS 1 STATION 1 GANTRY MOUNTED ROBOT WITH 2 ADDITIONAL GANTRY AXES FOR MIG WELDING OF RAILWAY GOODS WAGON SIDE WALL WELDING

  11. PRIMO AUTOMATION SYSTEMS SERVO CONTROLLED HEAD AND TAIL STOCK MANIPULATORS TO SERVE AS ADDITIONAL AXES FOR ROBOTIC WELDING

  12. PRIMO AUTOMATION SYSTEMS 1 STATION 1 ROBOT MIG WELDING WORK CELL WITH HEAD & TAIL STOCK MANIPULATOR FOR ASSEMBLING, ORIENTING & WELDING OF HYDRAULIC CYLINDER BARREL TO CAP END COVER WITH AUTOMATIC BARREL LOADING AND UNLOADING SYSTEM

  13. PRIMO AUTOMATION SYSTEMS 2 STATION 1 ROBOT 4 PARTS TOOLING FOR LINCOLN ROBOTIC WELDING WORKCELL

  14. PRIMO AUTOMATION SYSTEMS 2 STATION 1 ROBOT 4 PARTS TOOLING FOR LINCOLN ROBOTIC WELDING WORKCELL

  15. PRIMO AUTOMATION SYSTEMS 2 STATION 1 ROBOT 4 PARTS TOOLING FOR LINCOLN ROBOTIC WELDING WORKCELL

  16. PRIMO AUTOMATION SYSTEMS 1 STATION 1 SLIDER MOUNTED WITH HEAD AND TAILL STOCK MANIPULATOR WITH TOOLINGFOR RUBBER EXTRUDER SCREW HARDFACING

  17. PRIMO AUTOMATION SYSTEMS 1 ROBOT 1 STATION RUBBER MACHINERY EXTRUDER SCREW HARDFACING

  18. PRIMO AUTOMATION SYSTEMS 1 ROBOT 2 STATION TRACTOR WHEEL TO LUG WELDING WORK CELL WITH TILTABLE MANIPULATORS FOR OPERATOR SAFETY WHILE LOADING.

  19. PRIMO AUTOMATION SYSTEMS 2 ROBOT 2 STATION TRUCK PROPELLAT SHAFT ASSEMBLY AND WELDING SYSTEM INTEGRATED WITH LASER SCANNERS

  20. PRIMO AUTOMATION SYSTEMS 2 ROBOT 1 STATION AXLE BRACKET WELDING WORKCELL WITH ASSEMBLY FIXTURE AND MATERIAL HANDLING AUTOMATION

  21. PRIMO AUTOMATION SYSTEMS 1 ROBOT 2 STATION AXLE BRACKET WELDING WORKCELL

  22. PRIMO AUTOMATION SYSTEMS 1 ROBOT 1 STATION AXLE REINFORCEMENT RING AND COVER WELDING WORKCELL WITH 2 AXES POSITIONER WITH HYDRAULICALLY OPERATED TOOLING.

  23. PRIMO AUTOMATION SYSTEMS 1 ROBOT 1 STATION AXLE REINFORCEMENT RING AND COVER WELDING WORKCELL WITH 2 AXES POSITIONER WITH HYDRAULICALLY OPERATED TOOLING.

  24. PRIMO AUTOMATION SYSTEMS 2 ROBOT 2 STATION BRAKE SHOE MIG WELDING WORKCELL WITH HYDRAULICALLY OPERATED TOOLING.

  25. PRIMO AUTOMATION SYSTEMS 2 ROBOT 2 STATION BRAKE SHOE MIG WELDING WORKCELL WITH HYDRAULICALLY OPERATED TOOLING.

  26. PRIMO AUTOMATION SYSTEMS 2 ROBOT 2 STATION 4 TORCH AXLE HOUSING LINEAR MIG WELDING WORKCELL WITH HYDRAULICALLY OPERATED TOOLING.

  27. PRIMO AUTOMATION SYSTEMS 2 ROBOT 2 STATION 4 TORCH AXLE HOUSING LINEAR MIG WELDING WORKCELL WITH HYDRAULICALLY OPERATED TOOLING.

  28. PRIMO AUTOMATION SYSTEMS WE LOOK FORWARD TO WORKING TOGETHER WITH YOU FOR YOUR VALVE RELATED WELDING / OVERLAY AUTOMATION NEEDS

More Related