1 / 6

f/5 Status Andrew Szentgyorgyi Magellan SAC Pasadena / 16 Mar 2013

f/5 Status Andrew Szentgyorgyi Magellan SAC Pasadena / 16 Mar 2013. MMIRS Producing High Quality Results. MMIRS Upgrades. Reduction pipeline is now complete. New grism will be installed this Fall Faulty H2 array will be replaced with H2RG this Fall. Scheduling f/5. 35 nights in 2014a.

africa
Download Presentation

f/5 Status Andrew Szentgyorgyi Magellan SAC Pasadena / 16 Mar 2013

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. f/5 Status Andrew Szentgyorgyi Magellan SAC Pasadena / 16 Mar 2013

  2. MMIRS Producing High Quality Results

  3. MMIRS Upgrades • Reduction pipeline is now complete. • New grism will be installed this Fall • Faulty H2 array will be replaced with H2RG this Fall

  4. Scheduling f/5 35 nights in 2014a

  5. CfA Strongly Considering Moving MMIRS to MMT • Issues Attending a MMIRS Move: • When do we move it? • Would like to allow programs in progress to finish • Would like to allow observers to use upgraded instrument • Will depend somewhat on funding for move, esp. vis a vis the sequester • Would SAC consider allowing Megacam-only operations? • Megacam will be mothballed if not, demand is low at MMT • Commission f/5 instrumentation seems moot • Expect MMIRS would return on 5 year timescale • ( I will be 65 years old at that time) • SAC input requested

  6. .

More Related