An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TF Joint TestingData Acquisition Special Test Equipment Hans Schneider with Robert Marsala (609) 243-2017 hschneid@pppl.gov Engineering Operations April 2003

  2. Resistance Measurement PlanPrototype & Insitu Joints • Mechanical Prototype Testing • Electrical Prototype Testing • Maintenance Insitu Testing • Commissioning Insitu Testing Hans Schneider Engineering Operations

  3. Resistance Measurement PlanMechanical TF Joint Test System • Mechanical Prototype Testing • Cyclical Mechanical Loads Applied to Prototype Joint • Measure Joint Voltage Drop with 100 Amperes Applied • Voltage Measured at Two Joint Locations • Automated Test Stand Control & Data Acquisition Hans Schneider Engineering Operations

  4. Resistance Measurement PlanMechanical TF Joint Test System • Mechanical Prototype Testing • Cyclical Mechanical Loads Applied to Prototype Joint • Measure Joint Voltage Drop with 100 Amperes Applied • Voltage Measured at Two Joint Locations • Automated Test Stand Control & Data Acquisition • Joint Voltage Drop Accuracy Factors • Limited by Cycle Time • Initial Investigation Indicates 0.5% Should be Possible • Cycle Dwells Could Increase Accuracy to 0.2% or Better Hans Schneider Engineering Operations

  5. Resistance Measurement PlanElectrical TF Joint Test System • Electrical Prototype Testing • Cyclical Electrical Loads Applied to Prototype Joint • Measure Joint Voltage Drop with > 70,000 Amperes Applied • Voltage Measured at Up to Eight Joint Locations • Remote Control of Automated Data Acquisition System Hans Schneider Engineering Operations

  6. Resistance Measurement PlanElectrical TF Joint Test System • Electrical Prototype Testing • Cyclical Electrical Loads Applied to Prototype Joint • Measure Joint Voltage Drop with > 70,000 Amperes Applied • Voltage Measured at Up to Eight Joint Locations • Remote Control of Automated Data Acquisition System • Joint Voltage Drop Accuracy Factors • TF Power Supply Current Measurement Accuracy • Magnetic Field Influences on Measurement Leads & System • Unknown Accuracy at This Time Hans Schneider Engineering Operations

  7. Resistance Measurement PlanInsitu Maintenance Test System • Maintenance Insitu Testing • Permanent Test Cell Installation • Measure Joint Voltage Drop with +/-200 Amperes Applied • Each of 48 Joints Measured at One Joint Location • Automated Test Cell Data Acquisition System Hans Schneider Engineering Operations

  8. Resistance Measurement PlanInsitu Maintenance Test System • Maintenance Insitu Testing • Permanent Test Cell Installation • Measure Joint Voltage Drop with +/-200 Amperes Applied • Each of 48 Joints Measured at One Joint Location • Automated Test Cell Data Acquisition System • Joint Voltage Drop Accuracy Factors • “Ambient” Electrical Noise & Long Joint Cable Leads • Combat with DC Current Reversal & Long Integration Times • Unknown Accuracy at This Time Hans Schneider Engineering Operations

  9. Resistance Measurement PlanInsitu Commissioning Test System • Commissioning Insitu Testing • Utilizes Maintenance System Wiring • Measure Joint Voltage Drop with Up to 72,000 Amperes • Instrument One, Possibly Two TF Flag Joints • Data Collected via 908 or 3232 Transient Digitizer Hans Schneider Engineering Operations

  10. Resistance Measurement PlanInsitu Commissioning Test System • Commissioning Insitu Testing • Utilizes Maintenance System Wiring • Measure Joint Voltage Drop with Up to 72,000 Amperes • Instrument One, Possibly Two TF Flag Joints • Data Collected via 908 or 3232 Transient Digitizer • Joint Voltage Drop Accuracy Factors • TF Power Supply Current Measurement Accuracy • Magnetic Field Influences on Measurement Leads & System • Unknown Accuracy at This Time Hans Schneider Engineering Operations

  11. Resistance Measurement PlanPrototype & Insitu Joints • Mechanical Prototype Testing • Electrical Prototype Testing • Maintenance Insitu Testing • Commissioning Insitu Testing Hans Schneider Engineering Operations