An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. JRATSPost MS B R&D Contract Proposal(Nominal Structure)

  2. Introduction

  3. Section 1: Performance

  4. Performance & Technical Risk • # Successful Runs • Average Time for successful runs • Average Health for successful runs • Technical Risk • Design Strengths: • Key design characteristics (e.g., combat survivability, maneuverability, ease of control, armament/combat effectiveness, logistics supportability, producibility, affordability) that are clearly tied to the attainment of required capabilities noted in the system specification.

  5. Section 2: Producibility-Supportability-Deployability

  6. Producibility/Supportability/Deployability Producibility Index (PI) Logistics Supportability Index (LSI) Deployability Index (DI)

  7. Section 3: Test and Evaluation Schedule

  8. Test schedulefor EMD (from MS B to MS C) and LRIP effort (MS C to FRPDR) DT&E OT&E LFT&E Interoperability Technical - Test and Evaluation

  9. Section 4: Proposal Risk

  10. Based on: Past Performance (Assume “Low Risk”) Technical/Performance Risks Producibility –Supportability –Deployability Risks Manufacturing Risk JRATS T&E Schedule Risk Cost Risk & Mitigation Proposal Risk (Integrated Risk Assessment)

  11. Section 5: Cost/Price

  12. Post MS B R&D Contract Target Price (next chart) JUGV Life Cycle Cost (< $2.8B - highly favorable; <$3.8B - acceptable) JUGV Unit Procurement Cost (<$540K – highly favorable; <$600K – acceptable) Software Development/Integration Cost (also shown on contract target price chart) Cost

  13. Target Cost: H/W $___ S/W Dev/Int $___ General Risk Factor $___ TOTAL $___ TargetProfit: $__ Target Price: $__ Ceiling Price: $___ Share Line: (i.e., 60/40) PTA: $___ Contract Price

  14. Summary