1 / 16

Presentation Topics

Withlacoochee Regional Water Supply Authority Water Supply Plan Update #7 October 15 – November 15. Presentation Topics. Determining the Availability of Groundwater for Water Supply through 2035. Public Supply Demand Projections (2010-2035). Evaluation of Potential Wellfields.

aguilarj
Download Presentation

Presentation Topics

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Withlacoochee Regional Water Supply Authority Water Supply Plan Update #7October 15 – November 15

  2. Presentation Topics • Determining the Availability of Groundwater for Water Supply through 2035.

  3. Public Supply Demand Projections (2010-2035)

  4. Evaluation of Potential Wellfields Evaluation of Potential Wellfield Locations Wellfields Proposed for the 2010 Water Supply Plan

  5. Evaluation of Potential Wellfields Evaluation of Potential Wellfield Locations Locations of MFL Springs

  6. Evaluation of Potential Wellfields Evaluation of Potential Wellfield Locations Locations of MFL Springs and Lakes

  7. Presentation Topics • Reassess proposed well field locations from the 2010 Water Supply Plan • Determine which public water supply systems will have deficits in 2035 • Meet with county and city utilities • Revise potential well field locations • Determine potential well field production

  8. Hernando County – 2035 Water Supply Deficit

  9. Citrus County – 2035 Water Supply Deficit

  10. Evaluation of Potential Wellfields Evaluation of Potential Wellfield Locations Wellfields Proposed for the 2010 Water Supply Plan

  11. Sumter County – 2035 Water Supply Deficit

  12. Evaluation of Potential Wellfields Evaluation of Potential Wellfield Locations Wellfields Proposed for the 2010 Water Supply Plan

  13. Marion County - 2035 Water Supply Deficit (SWFWMD Portion)

  14. Marion County – 2035 Water Supply Deficit (SJRWMD Portion)

  15. Evaluation of Potential Wellfields Evaluation of Potential Wellfield Locations Wellfields Proposed for the 2010 Water Supply Plan

  16. Determining the Availability of Groundwater for Water Supply through 2035 • Once wellfield locations have been determined, groundwater availability will be determined through the use of the SWFWMD’s Northern District Model. • The production of the wellfields will be input into the model to determine how water resources such as wetlands, lakes, springs, and rivers in the vicinity of the wellfields will be impacted

More Related