An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Transbay Terminal /Caltrain Downtown Extension Project EIS/EIR

  2. Project Description • Provide anew Transbay Terminal - a multi-modal transit/transportation facility. • Extend Caltrain from 4th and Townsend to a new location underneath or near the new Terminal. • Establish a redevelopment plan & related development projects on publicly-owned land in the vicinity of the Terminal

  3. Section 3

  4. Redevelopment Plan Not in Redevelopment Area Proposed Project Boundaries

  5. Project Timeline • Joint Powers Authority Formed April 2, 2001 • Draft EIS/EIR Fall 2001 • Circulation Period (Public Hearings) Fall 2001 • Final EIS/EIR Fall 2002 • Redevelopment Plan Adopted Fall 2002 • Design Complete Spring 2004 • Construction Complete Winter 2008