Site testing of Mauna Kea. Mark Chun (Gemini) & Richard Wainscoat (IfA) 2001 October 22. Overall plan. Seeing monitors as basic measure Goal: run nightly for 2-3 years Monitor a few select sites Add turbulence profilers in ~week long campaigns over course of study

aida
Download Presentation

Site testing of Mauna Kea

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Site testing of Mauna Kea Mark Chun (Gemini) & Richard Wainscoat (IfA) 2001 October 22

  2. Overall plan • Seeing monitors as basic measure • Goal: run nightly for 2-3 years • Monitor a few select sites • Add turbulence profilers in ~week long campaigns over course of study • Simulations of wind flow, turbulence at targets sites

  3. Seeing Monitors • Two CTIO DIMM on loan • Issues • baseline, aperture size • min. exposure time of camera • mount stability in strong winds • Deployment & Support • Until approval from OMKM, must set up telescopes nightly • How to support long-term use until there is a facility seeing monitor

  4. DIMM Lab Integration • Hardware Mods • Camera -> 1msec • Integration and Tests at HP/Hilo • Setup procedures • Software improvements

  5. Work still to do on DIMMs • Automation • tested all aspects of manual operation • current effort is to make more robust (CTIO efforts) • Trailer deployment • maintain alignment, single person setup, wind screen • Leave setup for limited times? • Office of Mauna Kea Management • Calibration/Comparison • Comparison to focal-plane images, Subaru DIMMs • We want a GSM and Generalized-SCIDAR on MK

  6. “Regular” field use started • Team = 1 motivated UH-Hilo undergrad 1night/wk

  7. Selected test sites about summit • East/West ridge, future telescope sites

  8. Field test results

  9. Effect of Integration Time Data has been smoothed

  10. Realistic near-term goals • Compare local seeing effects at different places on summit/valley • Total of ~3-4 weeks time over a year • Systematic pattern of seeing on the summit? • A preferred location for a facility monitor? • Use of DIMMs for enclosure tests • Recruiting support for operations • Calibration/Cross checks • Collaboration w/Subaru -> 2 more DIMMs for study???

  11. Longer-term sites goals on MK • Seeing monitors • Hiring full-time support for seeing monitors • Goal is ~50% coverage of useable nights at four sites (Subaru collaboration for two more DIMMs?) • Towered location • CFHT tower, use original NOAO site survey towers?? • Turbulence profiler runs on MK spread throughout the year • Start next spring/summer, campaign mode • One run to coincide with a single-star profiler? • Wind and turbulence simulations for identified telescope locations on MK